Subject: JEMX Monday meeting 2005-03-29 Present: NL, CBJ, SB, CAO, JC, NJW JEM-X status: JMX2 started up end of rev. 298. On-Event-Messages were seen but power cycling helped. SAFE status during Easter. HV was set on beginning of rev. 300 but apparent problem with high speed line. This turned out to come from only 1 TM packet assigned - this should have been 5 (per polling cycle). This was fixed well before the narrow dither particularly set up for JEM-X. The JMX2 performance as last Crab calibration. JMX1 experienced a temperature increase of 4-5 deg C as a consequence as the JMX2 turn on. OSA5 preparations: j_ima_iros-1.1.3 not formally delivered yet. To be included: units of images, good flux determinations. j_cor_position SCREW regarding new detector map to flag accepted/used detector areas not accepted yet. j_calib_gain_fitting: there are small time periods where the gain cannot be fitted well. Covering up to about 5%. j_ima_mosaic: Half pixel off-set has been corrected. SCREW 1615 has not been accepted yet. The Misalignment Matrix has been delivered. Other business. CBJ: Rome meeting on future mission(s). Main goals: Higher sensitivity and polarimetry. (Home page exists) /NJW ---------- Niels J. Westergaard Danish National Space Center Juliane Maries Vej 30, DK 2100 Copenhagen O Phone: +45 35325705; FAX: +45 35362475