Summary of DSRI JEM-X Status Meeting: Monday 10th Feb 2004 1) Instrument status. Recently had one automatic shutdown of about 1 hour due to high countrates. Otherwise no surprises this week. 2) Patches. When do we want software patches performed? NL wants to do memory patching on JEM-X1 12 days before Crab calibration to check that both instrument and patch work well before calibration. No apparent problems with generating the patch. We may need more telemetry so as not to lose data to grey filtering. NL to raise this at next ISWT. SB to make statistics on how much data lost to grey filtering. 3) Munich Workshop. No one's yet completed their posters or presentations. NL may have to withdraw his `Obscured Sources' presentation: he'll be in Paris tomorrow. Final deadline for papers in the Proceedings is end of March. No good weak sources found by NJW's survey work, though many spurious sources. Hard to know which are spurious and which aren't. SB has found a nice burst with a clear pre-burst peak, but unfortunately it's not public data. $U 1730-333 is a rapid burster with peaks at 500-600 second intervals, due to clumpy accretion onto the neutron star. Current catalogues are insufficient to determine whether a source really is new or not. JC using mosaicking to find weak sources. Analysed GX5-1 for Ada, but power law fit is poor above 25 KeV. NJW suggests comparison with ISGRI data to check for excess hard counts. We've done GRS-1915 analysis for Diana. Cyg X-1 analysis for Miguel Mas-Hesse to compare with OMC results needs doing, but who's got time? CBJ sees clear misalignment (arc minutes) of collimator for sources within 3 deg.s of axis. Background can be checked by studying pulsating sources, (e.g. Vela pulsar) comparing shadowed and illuminated parts of the detector. Stefan uses this method for flux leakeage. 4) Crab Calibration. Not so important to have someone at ISDC for the calibration if the patching can be done well in advance and the health of JEM-X1 checked. NL and JC on holiday during week 1-8 March, and Ib is away until 4th March. Calibration is 28, 29 Feb and 1-4th March. 2nd March is co-ordination meeting at ISDC. SB will be our representative. CAO