Subject: JEM-X Monday Meeting 2008-05-06 Participants: NL, SB, CBJ, NJW. JEM-X status (SB): Gain relaxation at startup after eclipse takes approx. 10 hours. Gain dependence of temperature is now about 3.5% per degree. This dependence is linked to the change (diffusion of ions) of the material properties of the glass and hence to the general gain increase. A continued increase is therefore foreseen. Crab calibration (NJW, CBJ): Under preparation. OSA status (NL): The fix of the bug reported at last meeting has helped a lot and the fitting works much better now in j_ima_iros. A new set of correction parameters is being constructed. Next SDAST meeting (NJW): Now fixed on June 9th and 10th. /NJW