Subject: JEM-X Monday Meeting 2008-04-29 Participants: NL, SN, JC, CAO, NJW. JEM-X status (SB): Nothing to report. Crab calibration (NJW): Contribution to IACHEC meeting in progress. INTEGRAL Operations Coordination (SB): The most recent eclipse season finished without the usual problem with DFEE recovery after switching power off during eclipse. Telemetry distribution: Polling sequence buffer is now oversubscribed to 259 without any problem. ISGRI has some problems for intense sources where interruptions are seen in the light curve. Using a Russian ground station is no longer considered. Discussion of what to do if very bright transient occurs (10 - 50 Crab). JEM-X will autonomously switch off. SPI has no problem; otherwise wait and see. Time correlation: The situation is now almost understood and a new reprocessing (revision 3) of all data is considered. Mini SDAST (NJW): Minutes have been sent out. OSA status (NL): There was a bug in the correction for the electronic efficiency and j_ima_iros is starting to work better. /NJW