Subject: JEM-X Monday Meeting 2008-02-26 Date: Tue, 26 Feb 2008 11:51:42 +0100 (MET) Participants: SB, JC, CAO, NJW. JEM-X status (SB): Running as usual. No visible hotspot. Electron background spikes not seen. CAO: FRSS source #1 (Fe55) is more temperature dependent than the other 3 sources. (CAO to look into gain at the position of FRSS source #1). INTEGRAL Crab calibration (SB): Two orbits are assigned to the calibration since SPI and IBIS need better calibrations since the accumulated observation time over the mission life requires better calibration precision. Cross calibration effort (NJW): Need to contact Diego Goetz to hear if more JEM-X input is required. Cross calibration meeting (SB, NJW): Schloss Ringberg south of Munich in 19-21 of May, 2008. NJW or CBJ will participate from JEM-X. /NJW