Subject: JEM-X Monday Meeting 2007-01-10 Present: SB, JC, NL, CAO, NJW. JEM-X status (SB): INTEGRAL orbit parameters have evolved. We see high countrates at the end of each revolution. It should be asked at the orbit engineers how this will be in the near future. A change request for lowering of the voltage to be sent. There is an example in revol. 515 where a high temperature leads to an extra high gain. (JC): Anode at RAWX=144 has gone to lower count rate. Possibly a new dead anode. JEM-X livetime (SB, CAO): There was a discussion on the precision of the deadtime calculation, in particular in the case where the grey filter rejects a large fraction of the events. To be investigated in greater detail. INTEGRAL workshop (NL): It is on our shoulders to arrange the next workshop(#7). See http://www.spacecenter.dk/~njw/IWS7 /NJW