SDAST Closed Action Item List

ID Number Status Responsible Due Date Description
AI44_2 OPEN ALL June 2012 Turn their presentations into pdf files and send to either CAO or NJW
AI44_5 OPEN NL,CBJ April 2012 To ensure that their software gives fluxes in counts/cm^2/sec
AI43_1 OPEN NJW,NL,CBJ April 2012 Look into new 7-8keV feature in Crab spectra
AI43_4 OPEN JC April 2012 At next SDAST meeting present a new plot of position accuracy for OSA JEM-X images (single pointings and mosaics)
AI43_3 OPEN JC April 2012 Write a SCREW to get negative spectral bins to work properly in SCW pipeline: SCREW 2326
AI43_2 OPEN CAO,CBJ,LP Dec 2011 Look into getting HK and other data into the gain history tables that are already made: Closed with CAO's email describing new software 20/11/2011
AI42_7 OPEN NJW Mid 2011 Send out a Doodle email to organize next meeting
AI42_6 OPEN NJW Mid 2011 Update ARFs for both units
AI42_2 CLOSED JC Early 2011 Send an email with all his corrections
AI42_3 CLOSED JC Early 2011 Find which SPRs need to be written or re-activated to solve these problems (AI42_2)
AI42_4 CLOSED CAO Mar 2011 Send EK SDAST meeting minutes and presentations for instrument archive
AI42_5 CLOSED NJW Mar 2011 send EK Monday meeting summaries for instrument archive
AI34_1OBE CBJ/NL/NJW Mid 2008 Determine azimuthal angle characteristics parameters (collimator, SPAG, vignetting etc). NL team leader.
AI35_2 CLOSED NJW Early 2008 Initiate procedures to up date IMOD files with detector map
AI35_5 CLOSED NJW,CBJ?SB? Early 2008 Prove that the electronic efficiency will produce high quality ARF for Crab observation interpretation
AI38_3 CLOSED NL/SB Dec 2007 Investigate and characterize the outliers in NL's flux/position figures
AI38_4 OBE NL/PK Jan 2008 Organize testing j_ima_iros 7.1 at ESAC
AI38_5 CLOSED NJW Dec 2007 Write SCREWs for j_ima_iros, including those to report used gain and electronic efficiency
AI38_6 CLOSED NJW/JC Jan 2009 j_ima_iros output must be documented in ADD,including default energy bands
AI38_7 CLOSED CBJ/SB/NJW Jan 2008 Prepare a full calibration report
AI_39.1 OBE NL/CBJ Sep 2008 Do comparison of their physical parameters used in their methods.
AI_39.2 CLOSED NL Sep 2008 Provide a physical description of his model and parameters.
AI_39.3 CLOSED NJW Sep 2008 Check with NL whether BPL file has changed recently and find out whether it should be updated
AI_39.4 CLOSED JC/SP Sep 2008 Draft cross-instrument section for the current cookbooks
AI_39.5 OBE NL Sep 2008 Look into the sensitivity question and be encouraged to go back to the previous level of sensitivity
AI_39.6 CLOSED SP Sep 2008 Check that the OSM file is available in the SCW pipeline and to OSA for temperature housekeeping to be used by j_cor_gain
AI_39.7 CLOSED SP/ISDC Sep 2008 Make a tool to extract intensities from j_ima_iros and re-bin RMF
AI_39.8 CLOSED NJW Sep 2008 Define standard bins for the rebinning. Default will be 4 coarse bins. NJW to supply sets of 4, 12, 32, and 64 bins.
AI_39.9 CLOSED EK Sep 2008 Compare JEM-X and XTE galactic bulge data
AI_39.10 CLOSED SP Sep 2008 Write agreed SCREWs on the s/w
ID Number Status Responsible Due Date Description
AI38_9 CLOSED 26/6/2008 SS Dec 2007 Write SPR to remove BKG level from scripts/OSA GUI
AI38_2 CLOSED 26/6/2008 SDAST Feb 2008 All developpers to review AO documents made available by PK
AI38_8 CLOSED 26/6/2008 SB/CAO Jan 2008 Prepare necessary SPAG tables to update IMOD for JEM-X1
AI35_3 OBE 26/6/2008 SP Mid 2008 Verify (and urge programmers to ensure) that output of j_src_properites (lightcurves) is expressed in flux and that the spectra have the correct ARFs taking into account current gain
AI38_1 CLOSED 26/6/2008 SP Dec 2007 Update ISDC database with new event rate limit value used to determine BTIs
AI27.7 OBSOLETE 29/11/07NJW 19 July 2007 Make spectral response matrix for REST events and non-imaging data modes
AI_070214 CLOSED 12/3/2007 ALL 10/3/2007 Send suggestions for SDAST meeting agenda to NJW
AI_200906_3 CANCELLED 14/2/2007 NJW 29/09/2006 Deliver new ARFs to ISDC
AI35_10 OBE SB 30/06/2006 Check whether there have been changes in the spatial gain variation of the units that require updating the SPAG table
AI35_8 CANCELLED CAO 31/12/2006 Add a search engine to the JEM-X Instrument Forum to make it easier to find documents
AI30_5 CANCELLEDSB June 2006 Add search engine to his instrument status webpage
AI29_1 OBE 6/11/2006SB June 2006 To provide list of bad periods on webpage where JEM-X data in one or both unit may be suspect
AI35_6 CLOSED 3/11/2006 CAO 31/9/2006 Update the Gain webpage with average gain factor (PHA/keV)
AI_200906_1OBE 8/11/06 SB 22/06/2006 Send ISDC list of SCWs where instrument configuration isn't good for science purposes (BTIs)
AI_200906_2 CLOSED 12/10/06 CAO 29/09/2006 Deliver verified OCL files to ISDC
AI35_4 CLOSED 20/9/06 NJW 30/4/2006 Supply Simona with a list of SCWs to analyse for the science validation
AI30_6 OBENJW 19 July 2006 Put numbers (error estimates) to the imperfection of the vignetting correction
AI35_11 CLOSED 30/8/06 SB, CBJ 30/4/2006 Prpovide new figure of gain increase for SVR
AI35_12 CLOSED 30/8/06 JC 30/4/2006 Provide new figure of detector energy resolution for SVR
AI35_13 CLOSED 30/8/06 CAO 30/4/2006 Check that STATUS values appear in correct order in the table for SVR
AI35_14 CLOSED 30/8/06 NL 30/4/2006 Edit (mostly shorten) description of IROS procedure in SVR
AI060607_1 CLOSED 30/8/06 CAO 10/06/2006 Deliver template files for IC extensions to ISDC
AI060607_2 CLOSED 30/8/06 CAO 15/06/2006 Deliver test set of IC files to ISDC and Silvia for script development
AI060607_3 CLOSED 30/8/06 NJW 8/06/2006 Raise the question of dithering pattern constraints at the next Monday meeting
AI060607_4 CLOSED 30/8/06 DNSC team 5/07/2006 Send Peter a list of constraints on the free-format dithering patterns that can be used for KP proposals
AI060607_5 CLOSED 30/8/06 ALL 1/7/2006 Take a look at Soren's HK page and send him comments
AI35_9 CLOSED 30/8/06 SMN 30/06/2006 Implement selection of gain history tables in the scripts
AI060308_2CLOSED 30/8/06 PK, SMN 1/05/06 Write a section in the ISSW users manual on setting GTIs for very strong sources
AI060308_4CLOSED 30/8/06 PK,SMN 1/05/06 Ensure that problem of instrument stabilization is mentioned in the user manual
AI35_1 CLOSED 27/4/06 JC/CAO 30/04/2006 Make the list of anode status for both units available on the instrument forum
AI35_7 CLOSED 25/4/06 CAO 30/4/2006 Add clear statement to gain webpage to read the notes if the line for a revolution is a different colour than usual
AI060308_5CLOSED 7/4/06 ALL 15/03/06 Send Jerome dates when they are available to be instrument representative at ISDC
AI060308_6CLOSED 7/4/06 ALL 7/04/06 Create a list of instrument representative responsibilities and activities
AI060308_1CANCELLED NJW,PK 15/03/06 Update limit table used to determine GTIs, especially hardware and software trigger limits, so that very strong sources can be viewed.
AI060308_3CLOSED CAO 15/03/06 Send email to ISDA operators suggesting they report all unusual activity to us.
AI060201_1 CLOSED ALL 15 Feb. 2006 Everyone to send NJW an email with their availability for an SDAST meetingin late March, early April 2006
AI050615_1 REGULAR WORKCAO 2006/01/01 Re-arrange SDAST forum so that documents are easier to find
AI30_11 OBE 12/12/05NJW end Jan 2005 Find fluxes integrated over all energies for all pointings of last Crab calibration (FM1) using OSA4.2, to compare with Carls results
AI30_15 OBE 12/12/05SL/NJW 2004/12/30 Compare C-structures with NL's to streamline use of structures in the shared library
AI30_8 CLOSED 12/12/05CBJ Xmas 2004 Make Crab flux error estimates with and without collimator tilt corrections and circulate to SDAST
AI30_10 CLOSED 12/12/05CBJ Dec 2004 Remake collimator tilt corrections split up into several energy bands
AI29_2 OBE 12/12/05SB/CBJ 15 Dec. 2004 Determine whether new `open' rejection criteria have actually improved data quality (more real events vs. more noise)

Action#		On	Due		Description
Status

AI981113_1	PK	27/11/98	 Provide information about tools
& techniques for automatic documentation of ISSW within the ISCD system
Answer: in developement.
CLOSED 27/11/98

AI981113_2	CAO	20/11/98	Provide LaTeX style file for DD
documents to the rest of SDAST for evaluation.
CLOSED 23/11/98

AI981113_4	CAO	20/11/98	Complete and distribute summary
of data format versus data structures.
CLOSED 27/11/98

AI040303_1 CAO	12 Mar 2004	Write update to Know Issues file at ISDC
CLOSED 19/3/04			detailing conditions where gain smoothing fails


AI981120_1	CAO	27/11/98	Find out where imaging data is binned
into spectra in the ISSW. Answer (23/11/98) in JCreateSpectrumMode in 
JDataPreparation.
CLOSED 23/11/98

AI981127_1	AH	1/12/98		Make a list over tricky schedule dates
for use at Thursday's planning meeting.
CLOSED


AI981127_4 	ALL	ASAP		Send email to ALLAN to tell him when
you are free for a meeting in January.
CLOSED

AI981127_5	ALL	ASAP		Send email to CAO with list of points to
raise at the Geneva meeting next week.
CLOSED

AI981127_6	SL	11/12/98	Send URL for prototyping web site to
other SDAST members.
CLOSED


AI981204_1	NJW	15/1/99		Provide calibration spectra in FITS 
format to CAO for coding/prototyping/testing of JGainCalculation components.
Also need to provide the values of the peak positions and widths.
CLOSED 14/1/99


AI981204_2	ALL	11/12/98	Determine if there are any dependancies
not appearing on the Gantt chart that could hold up coding.
CLOSED.8/1/99

AI981204_4	CAO/AH/NJW	11/12/98 Send email to other SDAST members 
about the subjects discussed at the Geneva meeting (30/11/98 -- 3/12/98) so that
these subjects can be discussed at next week's chat-meeting.
CLOSED(CAO 4/12/98)

AI981211_1	JH		30/12/98 Check over the level1 and 2 data 
structures in the Data Structure Definition Document.
CLOSED 8/1/99

AI981218_3	ALL	Mid Jan 1999	Check through CTS2.2 and make sure that
there's nothing impossible in it. CAO to find URL for the non-draft release and
send it to all SDAST.
CLOSED 15/1/99

AI990108_1 	AH	15/1/99		Set up a meeting with Gerry and/or Jean
to be exclusively about background determination/handling issues. The date will
probably be Febrauary 1/2 1999.
CLOSED 15/1/99

AI990108_3	PK	15/1/99		Inform SDAST of the result of discussions
with ISDC software gurus about the writing of `nice' ISSW, and the correct way
to do things.
CLOSED 15/1/99


AI990108_2	ALL	20/1/99		Ponder the background handling/detemination
problem and send all questions (even `stupid' ones) to NJW so that a proper 
overview of the problem can be assembled before the background meeting with
Jean and/or Gerry.
CLOSED 22/1/99


AI990115_2	NJW	1/2/99		Circulate note on background handling
problem to include a list of questions and points raised by SDAST (see 
AI990108_2). This note is to be produced in collaboration with Juhani Huovelin.
CANCELLED 22/1/99

AI990115_3	ALL	ASAP		Read PK's email about nice programming
practices.
CLOSED 22/1/99

AI990122_3	NJW,JH,SL 28/1/99	Create a discussion document on the
background handling problem, that can be used as a basis for discussion in
the Febuary meeting.
CLOSED 27/1/99

AI990122_4	ALL 	27/1/99		Think about possible agenda item
for the february meeting and submit them to Allan.
CLOSED 27/1/99

AI990122_5	AH	28/1/99		Make draft agenda for Febuary meeting.
CLOSED 28/1/99

AI981113_3	AH	 3/02/99		to look into the usage 
of the countrate information provided with the restricted
image mode, especially where it is extracted and where used
Date moved back 22/1/99
CLOSED 5/2/99

AI990122_2	PK	5/2/99		Find out more, or arrange more for the
prospective ISSW school at ISDC
CLOSED 5/2/99


AI981204_5 	AH/NL	Feb 1999	Provide list of parameters for OSM to
display
CLOSED 26/2/99

AI981218_2	ALL	19/2/99	Provide a list of wishes for JEM-X specific
routine in DAL3.
CLOSED 26/2/99
 
AI990122_1	ALL 	19/2/99		Read Stephane Paltani's web pages on
DAL3 for SPI so that this can be discussed at the next chat-meeting.
CLOSED 26/2/99

AI990205_1	PK	ASAP		Find out how many ISDC SW gurus can
be available for our ISSW `school' and email us with the results so we can
find good dates.
CLOSED 19/2/99

AI990205_2	ALL	19/2/99		Draw up list of topics to be covered 
at the ISSW `School' in March.
CLOSED 26/2/99

AI990226_1	ALL 	1/4/99		Find out when we can all make it to
ISDC to see the SAX WFC software. April 22-23rd possibly? Peter to ensure the
software is running at ISDC.
CLOSED 16/4/99

AI990326_1	ALL SDAST 23/4/99	Everyone to read Stephane's proposed
data structures, and make lists of comments etc. so that these structures
can be discussed at a dedicated chat on April 23rd.
Closed 26/4/99

AI990416_1	ALL	23/4/99		Everyone to circulate and email list
of data structure-related questions before the chat meeting dedicated to
that subject
Closed 26/4/99

AI990426_1	CAO 	ASAP		To get the instrument people to provide
an officially updated telemetry packet description to give to ISDC PreProcessing.
This matter to be raised at the next JEMX Tuesday afternoon meeting with
the IT. At the very least we must know which formats are considered stable now.
CLOSED 7/5/99

AI990426_2	ALL	5/5/99		Everyone to circulate emails containing
questions/concerns about instrument description data structures in preparation
for chat meeting Friday 7/5/99.
CLOSED 7/5/99


AI990326_2	CAO	ASAP		To get NL to send ISDC info on the
countrate packet so that  Preprocessing can get to work on this 
telemetry.
CLOSED 7/5/99

AI990507_1	AH	ASAP		Arrange a meeting of ISSW/IT people
to discuss the if and when of observational, rather than Sci Win, analysis.
CLOSED 11/5/99

AI981204_3	AH/NJW	May 1999	Determine whether an observational QLA
is needed for JEM-X
CLOSED 21//5/99


AI990528_1	CAO  June 7th 1999	Provide a `skeleton' ddd template
to other developers for making very first version of DDD entries for components
still under developement.
Closed 10/6/99

AI990416_2	ALL	JUNE 1999	All coders to provide files using
ddd.sty commmands for the DDD: V1 modules require full documentation, while
all others are sufficient with basic information only.
Superceded by AI990820_4


AI990820_1	ALL	Today!!	Send AH email with DETAILED  status of each
and every component for which one is listed on the MOU and ADD.
CLOSED 26/8/99

AI990820_2	AH, CAO	Circulate summary of ISSW status to all SDAST
CLOSED 26/8/99

AI990827_1	ALL 	ASAP	Send travel plans and hotel room requirements
to Juhani for Helsinki meeting 22-23 Sept 1999
CLOSED 02/09/1999.


AI990903_1   CAO	October 1999 Find out when test data will be available 
from a detector with flight electronics which implement the most uptodate 
version of the packet formats. 
CLOSED 19/11/99  

AI12.4	SM	End Nov'99 Research better software for weekly remote meetings
CLOSED 19/11/99

AI12.13 All	Check consistency of proposed data structures with rest of ISSW
superceded by AI991119_4

AI12a.1 NJW	mid Nov'99 Discuss image data structure names with PK
superceded by AI991119_5

AI12a.14 PK	Mid Nov'99 Proposed data structure names approved by Stephane
CLOSED 19/11/99	for the six new structures for background data

AI12a.16 NJW	Mid Nov'99 Check if the number of rejected events is in the JEMX
CLOSED		HK data


AI991112_1	JH	17/11/99 Send CAO details of Finnish student resources
for help with QLA.
CLOSED 19/11/99

AI991112_3	CAO	ASAP	Circulate updated, complete, consolidated
CLOSED 19/11/99			Open Action Item list to all SDAST members

AI12a.13 SL	3/12/99 Make a technical note on background data storage.
CLOSED 10/12/99

AI12a.11 NJW	End Nov'99 Find out when system calibration test is taking place
CLOSED 10/12/99	Answer: August 2000

AI12a.19 NJW	Beg.Dec'99 Update technical note on background handling
CLOSED 10/12/99		


AI991112_2	CAO	End Nov 1999	Set up a repository for test data from
jemx instrument, sorted into ISDC data structures by JDataUnpack.
CLOSED 10/12/99


AI991119_1	CAO	ASAP	Talk to IT about getting test telemetry
packages sent to ISDC
CLOSED  10/12/99

AI991119_2	SM/EE 	ASAP	Distribute tkirc to SDAST so that it can be
tested by the whole team in December
CLOSED 10/12/99

AI991119_3	AH	Mid-Dec Get tkirc running at DSRI in time for test
chat-meeting with this software.
CLOSED 10/12/99

AI991119_4	ALL	3/12/99 Prepare lists of I and O data structures needed 
for each component in time for data structures chat on Friday 3rd dec.
CLOSED 10/12/99

AI991119_5	PK	3/12/99 Prepare summary of ISDC policy on the naming
of image data structures, from SPI data structure proposals.
CLOSED 10/12/99

AI12a.7 NJW	ASAP Find out if there is a change in the number of
CLOSED DEC'99		bits in the JEMX TIME timing format

AI12a.18 NJW, PK, SL
CLOSED DEC'99	End Feb 2000 Update ADD sections 2.5.2, 2.5.3 and 2.5.4
		of ADD (background handling descriptions in various components)

AI991208_2	PK,NJW,SL,JH 10/01/2000 How do we want to store the 
background data structures in terms of fits extension(s)???
CLOSED 13/1/00

AI991208_3	PK	10/01/2000	Make a presentation of Reiner's OSM
capabilities especially where GTI's are concerned, for the January meeting
CLOSED 13/1/00

AI991208_4	PK, SL, NJW 10/01/2000 Determine what the later ISSW processing
needs by GTI and event evaluation information.
CLOSED 13/1/00

AI991208_5 	PK 	10/01/2000	Find an ISDC approved name for the
consolidated GTI data structure and other data structure names mentioned in
SL's summary of 8/12/99.
CLOSED 13/1/00

AI13.1	CAO	ASAP 	Send EID-B5.1 and other docs for JEMX to Nicolas 
CLOSED 17/1/00		Produit

AI12.3	CAO	Mid Jan 2000 Make a checklist for data sanity checks and include
these in a c program to be distributed amongst SDAST members to be used to 
verify data coming out of preProcessing.
CLOSED 18/1/00

AI13.12 ALL	Explore the test data available at:
CLOSED 25/1/00	http://www.dsri.dk/~oxborrow/sdast/sdast_forum.html (click on
		`Science windows' under heading `Test Data from EM'). Thereafter
		possibly request sets of test data and provide feed-back to
		Soeren Brandt.
		
AI13.13 CAO	Provide ISDC with the disclaimers for the available test data.
CLOSED 25/1/00

AI13.14 SB	Provide a set of test data which is as complete as possible
CLOSED 25/1/00	(All modes, lots of grey filter changes etc.) and with no 
		known bugs (!).
		
AI13.7 PK	Provide a description  of radiation monitor availability, and 
CLOSED 25/1/00	other HK data names in ISDC (e.g. JMXi-CSSW-HRW)

AI13.2	NJW/SL/PK JAN 31 Investigate background access at DAL3 function
CLOSED 8/2/00

AI990820_3	ALL	End Feb 2000 Send CAO updates for ADD - includes all
background handling material, templates for new data structures and written
overview descriptions and updates to bibliography.
CLOSED 7/3/00

AI12a.17 JH	End Feb 2000 Update ADD description of background data handling -
CLOSED 7/3/00		sections 2.5 and 2.5.1 of ADD

AI13.18 JH	End Feb ADD: rewrite the generic background handling part
CLOSED 7/3/00

AI13.19 SM	End Feb ADD: rewrite the background introduction section
CLOSED 7/3/00

AI13.20 PK	End Feb ADD: write general introduction about GTIs: what 
		they're made
CLOSED 7/3/00	from and where they come from

AI13.21 PK	End Feb ADD: provide new data preparation diagram
CLOSED 7/3/00

AI13.22 PK	End Feb ADD: Update ISDC context diagrams: NRT, Consolidated, 
CLOSED 7/3/00	Offline

AI13.23 ALL	End Feb ADD: check component for delivery dates (versions) and 
CLOSED 7/3/00	completion status

AI13.24 ALL	End Feb ADD: Provide information to CAO to change data  
CLOSED 7/3/00	repository information to group data structures in the data 
		dictionary

AI13.25 ALL	End Feb ADD: Make sure each and every component is updated, 
CLOSED 7/3/00	and not just a cut-and-paste copy of some other component you 
		have.

AI_000229_1	ALL	3/03/00 Send CAO ALL contributions to ADD 
CLOSED 7/3/00

AI13.3	CAO	End Feb Ensure that Hardware team provides a list of 
CLOSED 7/3/00		HK parameters to be used for determining GTIs

AI13.4	ALL 	End February Provide criteria for evaluation of events in 
CLOSED 7/3/00	JEventEvaluation

AI13.5	ALL	End January	Agree on principle of contents of columns in
CLOSED 7/3/00		event files

AI13.6 PK/NJW/SL Jan 31	Decide on skipping hardcoding of production of
CLOSED 7/3/00			reduced formats from Full Imaging for example
				in JDataBinning

AI13.10	NJW/AH/PK End Feb Comment on proposal for derivation of 
CLOSED 7/3/00		scaling parameters for background

AI13.16 ALL	mid Feb Discuss with Nicolas Produit  which  calibration data 
CANCELLED	will be  availablefor testing at ISDC

AI13.27 SM/JH	Jan 31 Specify background requirements for our ISSW to 
CLOSED 7/3/00	Southampton - and tell Allan S/H requirements for drawing 
		formats.
		
AI13.28 AH	Jan 31 Provide the latest JEMX drawings to the SH group
REPLACED		

AI981127_2	ALL	FOREVER		Submit application-by-application
activity reports until the end of the integration phase. End-of-month reminders
to be sent to SDSAT by CAO every month.
REPLACED

AI990507_2	CAO, AH, PK, SB end May 99	To find out how the onboard
binning and PI channels will be determined  and how changeable any of these
three might/can be. This requires also consultation with the IT.
CLOSED /7/3/00

AI12.7	ALL	End Nov'99 Read DAL3JEMX manual and forward bugs to Stephane
CLOSED

AI991208_1	ALL 	FOREVER Send CAO complete component status summary
at the end of each month.
REPLACED

AI13.9 PK	March 9th Presentation of ISDC GUI at meeting # 14
Closed 9/3/00

AI13.11 ALL	9/03/00 SDAST to think about how exactly to handle the 
9/3/00		grey filter in ISSW

AI14.8	PK	March 10 Distribute preliminary template for dead-time table
CLOSED 10/3/00

AI14.1	CAO	March 16 Provide test data calibration data in new format
CLOSED 31/3/00		for ISDC self-consistent test SWG

AI14.13	CAO	March 13 All components to be sent back to developers to be
CLOSED 20/3/00			updated.

AI14.4	CAO	April 1	Write the new data structures to the Data Dictionary
CLOSED 4/4/00			for ADD5.0

AI14.11	SL	March 19 Comment on the analysis output definitions presented
CLOSED 4/4/00			by PK

AI13.26 ALL	April Prepare for ADD second review in April
CLOSED 26/4/00

AI14.2	SM	April 1 Describe more fully background model for introduction
CLOSED 26/4/00		to background handling in ADD5.0

AI14.5	NJW	April 1 Upgrade ADD entries
CLOSED 26/4/00

AI14.9 	ALL	End March Specify a first proposal for group dependance in
CLOSED 26/4/00			executable input and output (including INDEX files!)

AI14.10	ALL	April 1	Update ADD entry with information on group dependance
CLOSED 26/4/00

AI14.12	ALL	April 1	Provide templates for all - especially missing- data
CLOSED 26/4/00			structures for ADD

AI 040400_1	CAO ASAP Find out if there are GRANAT specialists at ISDC
CLOSED 26/4/00

REVII_08	CAO	ASAP Send URL for OGIP standards homepage to all SDAST
CLOSED 9/5/00

REVII_07   AH/SB/CAO	15/5/00 To discuss the feasibility of KSC spatial
CLOSED 8/5/00			gain calibration during a monday software meeting.
			Must get information from Helsinki first about which
			sources they propose to use.

AI14.7	ALL		V2 executables must use deadtime table - make your own
CLOSED 25/6/00		dummy values using Peter's template until real test
			data is available

REVII_03	PK	15/6/00	Look into the feasibility of setting up an OSM
Closed 25/6/00		(and possibly ROOT too) workshop for SDAST members at
			ISDC

REVII_10	ALL	15/5/00 Remove/rename/redesign intermediate files so
Closed 25/6/00			that all data structures become legitimage archivable
			ISDC data structures.
			
REVII_11	CAO	Merge j-cor-gain-temporal and j-cor-gain-spatial
Closed 25/6/00

AI990820_4	ALL	11/00 	Send CAO contributions to DDD version 1.0
CANCELLED 09/00

AI_000307_1	AH 	7/00	Get Josef to make drawings to send to 
CLOSED 09/00				Southampton for background simulation

REVII_09	ALL	6/00 Look through OGIP standards and correct own
CLOSED 09/00			data structure column and keyword names accordingly.

AI000509_1	AH/NJW	7/00 Circulate email to rest of SDAST outlining
CLOSED 09/00		ideas for KSC discussed at the DSRI Monday software
			meetings.
			
AI13.8 	SM 	11/00  	Discuss interactive version of background programs 
CLOSED	31/10/00	with Bruce O'Neil at ISDC

AI14.6	CAO	12/00	Provide executable to calculate dead-time
REGULAR WORK

001031_5	NJW	8/11 Circulate email about his needs/ideas for
CLOSED 6/11/00		interactive background handling: preparation 
			for chat

AI16.1	PK	10/00	Figure out if lc_pick is now lc_find and if gti is
CLOSED 7/11/00			now gti_create

AI16.3	PK/SL	10/00	To decide a common start time for time binnings
CLOSED 10/00

001031_3	ALL	8/11/00 Send corrections/feedback to CAO on the new
CLOSED 7/11/00			jemx.h updated with RP2.0 data structures, and 
				the updated ADD data dictionary.
	
AI16.2	CAO	10/00	Investigate use of OBT wrong flagging in correction
CLOSED 7/11/00			executables

AI16.12 CAO 	10/00	Redo the error code scheme set out in jemx.h to follow
CLOSED 7/11/00			the new ISDCLEVL architecture better

AI16.6	CAO	10/00	To provide a list of data structures to be visualised
CLOSED 7/11/00			together using ROOT/OSM functionalities

AI13.15 NJW/CAO	11/00 	Find out what calibration data (products) will be 
CLOSED 7/11/00		provided bythe calibration activity, and what 
			calibration data structuresare needed
			
AI16.10	ALL	10/00 	To provide to Sami a list of what we want the 
CLOSED 9/11/00			interactive background analysis to accomplish

001031_1	ALL	12/00 Decide what we want from interactive background
CLOSED 9/11/00			analysis

001031_4	SM	8/11 Send an email to all SDAST about current and future
CLOSED 8/11/00			plans for background handling as preparation for chat
			about interactive background handling.
			
001031_6	SL	8/11 Circulate email about his needs/ideas for
CLOSED 8/11/00		interactive background handling: preparation for chat

001031_7	ALL	9/11 To read the emails about interactive analysis
CLOSED 9/11/00		as preparation for chat about interactive background
			handling.
			
AI16.8	PK	10/00	To sketch I/O and template support for j_ical
CLOSED 7/11/00

CAL1.2	NJW	15/11	To look into where conversion from detector pixels to
CLOSED 15/11/00		mm occurs (maybe it will be in j_cor_position)

AI38.4 CAO	22/11/00 Circulate email about how to use ADD CVS repository
CLOSED 24/11/00			WHEN it's up and running.

AI38.2	ALL	25/11/00 Take a look at the list of common parameter names
CLOSED 25/11/00		and comment on any inconsistencies/problems that might
			be discovered. The list is at:
			http://www.dsri.dk/~oxborrow/sdast/param_names.html
			
CAL1.3 CAO	31/11	To make a data structure template for JMXi-SPAG-MOD
CLOSED 1/12/00

AI14.3	SM,AH	10/00 	Contact Russian GRANAT specialists to get background
CLOSED 5/12/00			information from mission

AI16.4	SM	10/00	To define interactive background handling
SUPERCEDED by IBH 1.1

IBH1.1 SM/SL	10/12/00Circulate email with a summary of the design
CLOSED 18/12/00		requirements for their executables that were decided 
			during the chat meeting.

AI40.2 CAO	5/12/00 Ensure that background data structure DOL parameter
CLOSED 5/12/00	names are all in the parameter name list. Parameter names to
		use, consistently, dbg and bkg instead of ibg.
		
AI40.1 PK	10/12/00 Organise informal meeting between SDAST and GRANAT
CANCELLED	visitors at ISDC consortium meeting to discuss backgrounds and
		background handling.
		
REVII_02  	CAO	2/01/01 Update ADD overview and data dictionary to
CLOSED 19/12/00		include ISDC processing levels based on PK's intro.

REVII-04	ALL	2/01/01 Update component descriptions for all components
CANCELLED		(including figures) that use -MOD, -CAL and -CFG files
			to describe where these will come from.
			
REVII_05	CAO	2/01/01 Write a description of location and archiving of
CLOSED 19/12/00		instrument-description data structures based on PKs
			description in the review meeting

AI16.7 AH,CAO	22/11/00 Check availability of JEMX slew data  for position
CLOSED 22/12/00		corrections

AI16.11	SM	10/00	To provide a detailed description of how the interactive
CANCELLED 03/01/01	background executable will work with data

AI16.13	AH	10/00	Contact Juhani to find out what is needed for the
CANCELLED 03/01/01	background.			

IBH1.2	ALL	15/12/00Read and comment SL and SM's emails as 
CANCELLED 03/01/01	preparation for more detailed AD figures

IBH1.3	SL, SM	5/1/01	Make and cirulate figures showing proposed data flow
CANCELLED 03/01/01	(data structures) for their respective IBH 
			tools/executables as preparation for meeting 9/1/01

AI17.6	NJW	28/02/01 Simulate slew data response to see if collimator
CLOSED 11/1/01	footprint can be used for position correction determination
		Answer: This will work well, especially for low energies, using
		multiple sets of slew data containing sources.

AI17.2	PK	26/01/01 Check if HK long term values are actually stored, so 
CLOSED 26/01/01	that one can look at them over long time periods


AI17.1	PK	02/02/01 Will provide the script/executable figures for ADD and
CLOSED 8/2/00	the figures must be commented and redrawn by February 9.

V2_rev1.7	SM/PK	30/1/01 Circulate examples of their *.txt and *.tex
CLOSED 21/02/01		files with parameter descriptions. Everyone else to
			use the same layouts in their *.txt and *.tex files.

V2_rev1.6	SL	15/2/01	Circulate email of suggestions for new input
CLOSED 20/02/01		parameters for binning executables. Everyone else to
			read and comment on emails

AI17.4	SM	26/01/01 Get information from the Instrument Hardware People
CLOSED 20/02/01	to know what they need more for the performance monitoring than 
		what is already in the plans for that and OSM 

V2_rev1.5	CAO	30/3/01 Update list of allowed values of evtType in the
CLOSED 26/02/01		common parameter name list

REVII_01  	PK/ISDC	2/01/01	Provide an introduction detailing ISDC plans
CLOSED 26/02/01		for using ISDCLVL, and how this relates to SWG1 etc.,
			data structures and processing.

AI16.9	CAO	2/01/01 To sketch ADD entry for the j_ical executable
CLOSED 23/02/01

AI38.3	CAO	2/01/01 Write little introductory piece of ADD about the 
CLOSED 13/03/01		binning tables for the different data taking modes.

REVII_06	SM/SL	2/01/01 Update component descriptions and diagrams that
CLOSED			use obsolete data structures: -CYCL-CNV, -DRV1-DRV, 
			-SPR1-SCP AND SRCL-SFR


REVII_12	ALL	2/01/01 Complete actions indicated by RIDs
CLOSED

AI40.3	ALL	15/01/01 All developers with S/W that uses background data
OVERRIDDEN	structure parameter names to correct them using the new
by		consistent parameter names and redeliver the affected
V2_rev1.4	executables.

AI18.3 PK	ASAP	Circulate email about instrument mode enumeration
CLOSED 26/3/01		within SDAST

AI18.5 PK	March 2001 Talk to Tim Lock about the mechanisms for updating
CLOSED 23/3/01		SRD and using SCREWs

AI18.7 PK	ASAP	Circulate chapter 18 of current ISDC SRD
CLOSED 26/3/01

AI16.5	PK/SM	30/11/00 Go through j_performance specifications and see how
CLOSED 16/3/01			well they fit into OSM

001031_2	SM	WHENEVER Circulate GRANAT background information within
CANCELLED		SDAST when (if) he gets it.

CAL1.1	NJW	15/12	To look into where conversion values for HK parameters
CLOSED			come from (JMXi-CONV-MOD)	

AI38.1	PK	15/01/01 Borrow ISDC software problem tracking tool for SDAST
CANCELLED			integration problems and to-dos.

AI17.5	ALL	26/01/01 provide a list of (also derived) parameters,
CLOSED		which need to be monitored from their ISSW as part of 
		j_performance

AI17.8	JH	28/02/01 Start a Tech Note on the IBG model strategies etc
CANCELLED

V2_rev1.1	NJW	30/3/01	Remove cleanIDX parameter from *.par files
CLOSED			and use clobber instead

V2_rev1.2	ALL	30/3/01 Use outSWG, override DOLs and inDol, outDOL
NORMAL WORK		correctly in CommonPreparePARS

V2_rev1.3	ALL	30/3/01	Use instMod as parameter to find JMXi-IMOD-GRP
NORMAL WORK		DOL

V2_rev1.4  SM/SL/PK	30/3/01 Update background executables with consistent
CLOSED			parameter names for background data structures. 

AI43.1	PK	23/03/01 Circulate email about ISDC defined constants for
CLOSED 26/02/01		JEM-X data-taking modes. SDAST to implement these
			constants in ISSW during V2 consolidation.

AI18.6	CAO	ASAP	Update and circulate The Figure according to changes
CLOSED 27/3/01		agreed during meeting #18

AI18.2 CAO	March 2001 Choose between names j_verify and j_prp_verify
CLOSED 27/3/01

AI18.12 CAO	March 2001 Talk to Soeren about electronic calibration and its
CLOSED 28/3/01			place in ISSW


AI18.8 CAO	April 2001 Make list of changes required for SRD
CLOSED 28/3/01

AI18.11 SL	March 2001 Email JEM-X observers soliciting their wishes/views
CLOSED 26/04/01		on how REST events are to be handled in binning
			executables

AI17.7	CAO/AH	30/4/01 Possibly look into usage of 
CLOSED 12/04/01	astrometric plate-scale functionality to handle 
		the position correction determination
		
AI18.10 PK	April 2001 Study feasiblity of making DAL3JEMX tool for
CLOSED 17/5/01		extracting REST images and events

AI45_1	CAO	May 2001 Write piece for ADD describing the system used to
CLOSED 20/5/01		assign error codes to the different ISSW components.

AI13.17 NJW	June 2001 Ensure that the calibration document will contain 
CLOSED 1/6/01			descriptions of data-formats, products etc. which will 
			be in telemetry format to be provided to ISDC

AI18.4 NJW 	June 2001 Investigate unfulfilled SRDs 18.21.4 and 18.21.6
Closed 11/06/01

AI19_22	CAO	June 2001 At consortium meeting ask if DSRI can have ALL the
CLOSED	27/06/01	data from the payload calibration tests

AI19_18	NJW	July 2001 Ask Southampton people what happened to our background
CLOSED  21/06/01 by NL		simulations we requested

AI19_8	CAO	July 2001 Find error codes for Peter's higher level scripts 
CLOSED 3/7/01	jemx-sci-analysis, jemx-scw-analysis, jemx-obs-analysis

AI19_3	CAO	July 2001 File SPR with ISDC to correct clock_reset_DUMMY.fits
CANCELLED (RP3.0)that was distributed with RP2.2

AI18.9 NJW	June 2001 Add detector pixel map to JMXi-DETE-MOD
CLOSED 5/9/01

AI19_13 CAO	July 2001 Send SM list of IBH tools needed, from meeting 18
CLOSED 5/9/01

AI19_5	PK	July 2001 Talk with Stephane Paltani about making a generic
CLOSED 6/9/01	tool to calculate detector coordinates from attitude data

AI18.13 PK/CAO	Sept 2001 Investigate a tool to write diagnostic data into
CLOSED 10/9/01		-RAW data structure formats - need written sketch of
			tool to do this.

AI19_4	PK	July 2001 Verify that units of IMAGE_LENGTH in -REST-SRW are
CLOSED 20/9/01	telemetry units (10^-9), and have not been scaled in PP

AI19_10	PK	July 2001 Check at ISDC whether OSM creates log files or writes
CLOSED 20/9/01	lists of OEMs etc.

AI19_1	NJW	July 2001 Make a template for -ANOD-MOD, or fill the already 
CLOSED 4/10/01	existing -DETE-MOD with mapping of anode values/health

AI19_20	ALL	Dec. 2001 Think about contents for User Manual
CANCELLED 4/10/01

AI19_21 CAO	Oct. 2001 Circulate template for UM document in tex
CANCELLED 4/10/01

AI19_2	CAO	July 2001 Meet with hardware team to decide what j_verify should
CLOSED 4/10/01	actually do


AI17.3	CAO	Oct 2001 To look into feasibility of having performance
CLOSED 10/10/01	and data preparation tools as one general tool with clever 
		parameter input (parser).

AI18.14 SM	Oct 2001 Create IBH document from SL's overheads and CAO's list
CLOSED 10/10/01		of required tools

AI19_12	SM	Oct. 2001 Make tool to construct complete time-filtered table 
NORMAL WORK	of all performance parameters that must be monitored

AI19_14 PK	Oct 2001 Ask at ISDC how to find orbital phase of S/C
CLOSED 8/10/01

AI19_15	SM	Oct 2001 Read DAL3AUX user manual to find which conventions are
CLOSED 10/10/01	used for sun angle and roll angle

AI19_16	NJW	Oct 2001 Provide SM with function to calculate roll angle
CLOSED 10/10/01
 
AI19_19	NJW	Oct 2001 Give SM his AutoCadd programs for making backgrounds
CANCELLED

AI19_23	SL	Oct 2001 Send SM a complete description of the bkg tools he
CANCELLED	will need for photon tagging

AI010920_1 PK	Oct 2001 Circulate email with lightcurve and spectral data
CLOSED 8/10/01	format proposals, for discussion during October's SDAST meeting.

AI010920_2 ALL	Oct 2001 Send Sami emails with all ideas, suggestions,
CLOSED 10/10/01	requirements for the interactive V3 performance/background
		 components.

AI20.7	CAO	ASAP Check why link to instrument model group is dead on
CLOSED 16/10/01	developper's forum web page

AI20.14 CAO	Mid Feb 2002 Add `Dream Tools' section to ADD for release 7.0
CLOSED 16/10/01

AI20.11	PK	ASAP Investigate how OSM should be exported to other institutes
CLOSED 17/10/01	for V3 developement with OSM/isdcroot

AI20.17 PK	ASAP Get ISDC to provide solid list of HK column names
CLOSED 17/10/01

AI20.8	PK	ASAP Change RESPONSIB keyword string to `Sami Maisala' in all
CLOSED 17/10/01	background model data structure templates

AI19_6	NJW	Oct 2001 Make sure that names in -CRW data structure are the
CLOSED 25/10/01	same as in the diagnostic dump data structure

AI20.2	ALL	26/10/01 Redeliver all ISSW that should use new HK column names
CLOSED 25/10/01	ISDC must come up with final suggestions for column names pretty
		soon for this deadline to be met
		
AI20.13 NJW,CAO	End Oct 2001 Assess priority of j-ical tools for a) payload
CLOSED 25/10/01	calibrations b) during operations c) dream tools, V4

AI20.10	PK	ASAP Circulate email to SDAST about unit testing and system
CLOSED 29/10/01	environment

AI18.15 NJW/NL	Oct 2001 Make sure that IT provides a list/table of HK 
CLOSED BY CAO 29/10/01		parameter limits for GTI determination

AIRAND_1 PK	Feb 2002 Update figures 3.1, 3.2 and 3.3, and section on GTI
CLOSED 31/10/01		determination for ADD7.0

AI20.9	SM	End Oct 2001 Make official delivery of background model data
CLOSED 31/10/01	structures to ISDC using their webpage tool

AI20.6	ALL	End Nov 2001 To check that all instrument model files have
CLOSED 31/10/01	all the necessary keywords filled

AI20.12 SM,CAO	Send PK and RR emails detailing specific problems with 
CLOSED 8/11/01	installation of OSM in Helsinki and Copenhagen

		
AI20.1	PK,SL	2/11/01 Redeliver all ISSW that needs to use the new spectral
CLOSED 22/11/01	formats
CLOSED PK 31/10/01

AI19_7 	NL	Nov 2001 Explore running NL's GRB-finding code with Jurek's 
MOVED TO	event-triggering system - i.e. making a compatible component
NORMAL WORK	for ISDC system
	
AI010906_1 ALL	Nov 2001 Look through ALL data structure templates released
ABANDONED	with RP3.0 and see whether there are missing templates,
22/11/01	changes, corrections or updates to the templates, or templates
		that should be removed. All requests for changes to be emailed
		to Marc Turler, PK and CAO. NJW's latest IC templates should
		also be looked through.

AI20.3	ALL	26/11/01 To update their help files (*.txt) for all future
CLOSED 22/11/01	deliveries, as per Masha's list of homework distributed at
		meeting
		
AI011108_1 ALL	All ADD updates to be ready and in the CVS repository by
CLOSED 22/11/01	9.00 Friday 16th November

AI221101_1 SM	26/11/01 Send CAO email as soon as he's delivered his ADD 
CLOSED 5/12/01	updates

AI18.1 NL	Nov 2001 Decide identity of instrument representative resident
NORMAL WORK 19/12/01	at ISDC with PI at DSRI

AI20.5	CAO,NJW	Keep ISDC informed about all developments in the instrument
CLOSED 19/12/01	status saga

AI20.15 CAO,NJW	End Oct 2001 Get together with NL and make a list of test cases
CLOSED 11/12/01	that will be needed for SV tests. Result: informal document
		to be circulated in IT and ISDC
		
AI21.5	PK	mid-Jan 2002 Check that his spectral test data are okay in the
CLOSED 3/1/02		zero channel

AI21.1	CAO	mid-Feb 2002 Find PK's nice figure of script structure and put
CLOSED 7/1/02			it in ADD 7.0

AI21.3	NJW/NL	mid-Jan 2002 Make FITS catalogue of a 25-pointing dithering
CLOSED 10/1/02		test sky to include all the SV test cases and deliver
			this to PK

AI21.6	NJW	31/12/2001 Give Spectral response files to SL so that he can get
CLOSED 10/01/02		with coding j_src_spectra

AI020131_1 SL	Feb 2002 Circulate email with suggestions on Marc's new 
CLOSED 5/02/02	JMX1-SRCL-LCR, JMX1-SRCL-LCR-IDX templates

AI020131_2 SL	Feb 8th 2002 Check all the -RAW data structures produced during
CLOSED	9/02/02	ROT (SVT-E) and make SPRs for any anomalies found

AI020131_3 CAO	Feb 8th 2002 Check all the FRSS data structures produced during
CLOSED	9/02/02	ROT (SVT-E) and make SPRs for any anomalies found

AI020131_4 PK	Feb 8th 2002 Check all the -PRP(OBT) data structures produced 
CLOSED	9/02/02	during ROT (SVT-E) and make SPRs for any anomalies found

AI020131_5 SM	Feb 8th 2002 Check all the -PRW(packet) data structures produced
CLOSED	9/02/02	during ROT (SVT-E) and make SPRs for any anomalies found

AI020131_6 NJW	Feb 8th 2002 Check all the -SRW data structures, grey values
CLOSED	9/02/02	and status table data structures producedduring ROT (SVT-E) 
		and make SPRs for any anomalies found

AI20.16 CAO	Jan 2002 Install RP, scripts, software etc. needed for SV tests
CANCELLED

AI19_9	ALL	26/03/2002 Read, understand, comment and correct Peter's most
CANCELLED	recently delivered scripts (download from ISDC config. control
		page)
		
AI20.4 SM,JH	26/03/2002 Find out what the big 4.9KeV peak in the simulated
CLOSED 26/3/02	backgrounds is. Ask Southampton if necessary

AI21.2	CAO,PK	mid-Feb 2002 Look into delivering jemx.h as an independant
CLOSED 26/3/02		component so that it can be used by the scripts

AI21.2	CAO,PK	mid-Feb 2002 Look into delivering jemx.h as an independant
CLOSED 26/3/02		component so that it can be used by the scripts


AI020314_2 CAO  26/3/02 Produce a draft version of the JEM-X ISSW Science
CLOSED 26/3/02	verification document according to RW's template, to be
		discussed at next SDAST meeting
		
AI020321_1 PK	April 2002 Decide on a streamlined procedure for updating
CLOSED 26/3/02	ADD with Tim Lock

AI22.1  PK	April 2002 Write SPR on all JEM-X ISSW to change `chatty'
CLOSED 4/4/02		parameter to `chatter'

AI22.7	CAO	5/04/02	Check instrument model data structures ENRG, BORE
CLOSED 5/4/02		and DXBS appear in all relevant documents

AI20.18	ALL	5/4/02 2002 Complete ADD updates for release 7.0
CLOSED 17/4/02

AI22.2	PK	April 2002 Set up s/w environment for Silvia under jemx/dev
CLOSED 18/4/02		so that she can help develope scripts

AI21.4	PK	5/4/02 Make test data simulations for SV from the FITS 
CLOSED 18/4/02		catalogue provided

AI22.4	PK	5/04/02	Do Standard Analysis of the SV test cases using
CLOSED 18/04/02		ISDC processing environment and circulate results in
			tarball to SDAST, especially the astronomers

AI22.11	CAO	24/4/02 Complete GSSR chapter and deliver to ISDC
CLOSED 10/5/02

AI22.13	CAO	April 2002 Write SCREW/SPRs for all her V1/V2 components
CLOSED 20/5/02

AI020418_2 ALL	May 7th	Complete updates for V1/V2 components. Penultimate
CLOSED 7/5/02		delivery before launch

AI22.10	SM	5/4/02 Circulate DETAILED description of background handling
CLOSED 5/5/02			design, algorithms, input, output etc.

AI22.12	PK	24/5/02	Run IOSM on Sami's master performance paramters table
CLOSED 	23/7/02		to see if this can be used for performance
			visualisation - find out what to do to make it work.
			
AI22.3	NJW	April 2002 Write SCREW that found source fluxes should be
CLOSED 23/6/02		calculated using instrument model data, to lessen
			photon leakage
			
AI22.5	NJW,SL	19/4/02 Go over PK's SV results and provide conclusions for
CLOSED 23/6/02		the SVR

AI22.6	NJW	24/04/02 Complete SVR and deliver it to ISDC
CLOSED 23/6/02

AI22.9	PK,NJW,SM,SL May 2002	Stay in close email contact regarding 
WORK		background handling design, implementation and coding
				
AI020502_2 SL, NJW, PK End May. Provide full and detailed critique of Sami's
CLOSED 23/6/02	Architectural Design for interactive background handling

AI19_17 NJW	Aug 2002 Provide SM with diffuse sky maps from which to make
CLOSED 19/08/02		diffuse background models

AI18.16 NJW/NL	ASAP Make sure IT provides a list of HK parameters
CLOSED 28/8/02			to be monitored by operators in NRT

AI19_11	NL	Aug 2002 Talk with IT and Nami about what derived HK parameters
CLOSED 28/8/02		 	should be used for performance monitoring

AI23.5 	PK,NJW	Aug. 2002 Find OGIP standard names for Sami's columns COODEG
CANCELLED 28/8/02	and COOSTR

AI23.2	NL	Aug 2002 Write SPR on units of flux used for SKY.-IMA images
CLOSED 28/8/02

AI020822_1  NJW	Aug 2002 Circulate email with instrument representative rotation
CLOSED 28/08/02		plan to be approved by all participants

AI23.8	SM	ASAP	Email a summary of his background handling procedure
CLOSED 28/08/02		to all SDAST for comments

AI23.6	PK	ASAP	Write and URGENT SCREW to change JMXi-ATTI-DBG.tpl
CLOSED 28/8/02

AI23.7 	SM	ASAP	Make the new JMXi-ATTI-DBG.tpl template and deliver
CLOSED 28/8/02		it to Marc and Katja

AI020502_1 SL	Aug 2002 Spend a day performing analysis of SV results made by
CLOSED 5/9/02		Peter, and make a report of the results for the SVR

AI23.4 	NJW,SL	Sept 2002 Decide whether out-of-peak-loss factor should be
CANCELLED		part of IMOD-GRP, and if so where and when?

AI020828_1	ALL	6/9/02 Email NJW with list of dates when one is
CLOSED 10/10/02		available/unavailable for duty at ISDC
 
AI23.1	CAO	Sep 2002 Put some numbers to the detector gain problems that
CLOSED 10/11/02			have been uncovered recently

AI22.8	NL,NJW	24/10/02 Make PV phase plan: data handling strategi, personnel,
CLOSED 21/11/02			procedures, documentation and actions

AI021121_1: ALL	28/11/02 Bring edible goodies for the SDAST party in Gland.
CLOSED 28/11/02

AI24.1	PK	Jan 1  2003 Check there's nothing wrong with source matching in
CLOSED 4/12/02		q_identify_srcs

AI24.3	PK, CAO	 ASAP	Write SCREW for 16-bit status value in all -COR data
CLOSED 5/12/02			structures

AI24.4	CAO	ASAP	Get j_prp_verify redelivered with alerts only if a large
CLOSED 5/12/02		fraction of events fall outside active detector area

AI021205.1	PK, NJW, SL	Determine a status flag ordering scheme and
CLOSED 			email it to CAO by Wednesday 11th December

AI030124.1:	CAO	Feb 2003 Write SCREW and submit templates to extent
CLOSED	 20/2/03	j_prp_verify so it can produce dead-anode data
			by binning shadowgrams by rawX values


AI24.6	CAO	Dec 15 2002	Make SCREW for j-cor_position to flag with a
CLOSED 10/3/03		specific STATUS value all events near/on dead anodes and
			close to calibration areas

AI030130.1:	ALL	End-Feb 2003	Find travel times to Valencia for
CLOSED 6/3/03		SDAST meeting to aid planning of meeting and agenda


AI-CONS.2:	CAO	March 7 2003. Deliver new JMXi-DEAD-MOD table to NJW
CLOSED 11/3/03			for delivery to ISDC

AI-CONS.1: 	CAO, CBJ End-March 2003	Deliver new JMXi-SPAG-MOD table to
CLOSED 7/3/03			NJW for delivery to ISDC

AI21.7	NJW	Jan 20, 2003 Write architectural design for tool to do source
CANCELLED 1/4/03		finding on merged/mosaiced images

AI21.8	NJW	Dec 20, 2002 Write architectural design for tool to do robust
CANCELLED 1/4/03		spectral classification of found sources

AI020418_1 ALL	Jan 20 2003  Complete algorithm/limitations/details description
CLOSED 1/4/03	 for each component for Masha's UM and Peter's 
			presentation

AI24.5	NJW	Dec 15 2002	Decide on robust strategy/procedure/software
CLOSED 1/4/03		to watch out for new dead anodes that can be used
			a) automatically by operators (IOSM) and b) more
			complicated offline tool for IR at ISDC

AI24.7 ALL	Feb 2003 Complete all tasks listed in the timeline 
CLOSED 1/4/03

AI25.2 CAO,JC	April 11 2003	Verify SPAG-MOD tables with Carl, esp. where
CLOSED 4/4/03		co-ordinates are concerned

AI25.8	ALL	April 4 2003	Provide SVR contributions to CAO ASAP
CLOSED 9/5/03		

AI25.3 CAO	April 11 2003	Make grey scale version of SPAG tables for
CLOSED 13/5/03			documentation use

AI25.1	PK	April 4 2003	Write SCREW on j_dead_time_calc to include
CLOSED - SCREW 1135			buffer loss in RATE_COR

AI25.5	NJW,PK 	April 17 2003	Check how Sami can separate diffuse and 
NORMAL WORK			instrument background

AI24.2	NJW	June 11 2003  Resolve ARF changes
CLOSED 12/8/03

AI25.4 CAO	June 11 2003	Give PK time intervals with constant gains for
CANCELLED OBE			ESA report

AI25.6	PK	June 11 2003	Help NJW find problem in j_ima_src_find
CLOSED 12/8/03			catalogue handling

AI25.7	PK	April 17 2003	Make Sl's *****_pick tools internally available
CLOSED 12/8/03			to SDAST

AI020522_1 ALL	June 2003 Everyone to tell Jerome about a) flux units
CLOSED 12/8/03			and b) holiday plans	

AI26.15		SL	22 Aug 2003	Put meeting pictures on the Net
CLOSED 21/8/03

AI26.8		PK	31 Aug 2003	Check that data-gap-finding tool can handle
CLOSED 15/8/03				losses due to buffer flushing at end of SCW

AI26.1		JC	31 Aug 2003	Update list of activities to be performed by
CLOSED 1/9/03				instrument representative at ISDC

AI23.3		JC	Sept 2003 	Write section for the ADD and UM explaining 
CLOSED 21/10/03				flux units used for spectra and images
			
AI26.14		ALL	30 Sep 2003	Circulate emails with ideas for 
CLOSED 29/9/03				implementation of a superior imaging tool
					used over several SCWs (mosaicing)
					
AI26.13	   NL,NJW,PC	30 Sep 2003	Make a plan for how PC should tackle work
CLOSED 29/10/03				on NL's imaging program

AI030828_2	JC	31 Aug 2003	Email Sami a list of available recent
CLOSED 31/8/03			empty field data

AI031029_1	JC	7/11/2003	Discuss ISDC rotation frequency/length
CLOSED 3/11/03		with NL, not based on observations, and draw up new
			rotation list

AI26.2		CAO	31 Aug 2003	Investigate behaviour of JEM-X2 anode 1
CLOSED 5/11/03				calibration source rev.s 30  to 50

AI26.4		PK	22 Aug 2003	Check that relevant data structures are
CLOSED 5/11/03				XRONOS compatible, if possible, and write
					SCREWs for those that could be but aren't

AI26.5		SM	31 Aug 2003	Check that the data he's using for BKG
CLOSED 5/11/03				modelling is -COR data that includes
					Carl's SPAG and JC's anode corrections
					
AI031029_2	PK	7/11/2003	Send CAO area and constant name for the
CLOSED 5/11/03		the ideal detector area used to normalise fluxes

AI26.3		PK	30 Nov. 2003	Verify that systematic variations in found
CLOSED 14/11/03				positions of sources are related to the
					source's off-axis angle

AI031029_3	ALL	12/11/2003	Perform circular review of ADD 8.0
CLOSED 19/11/03		in preparation for  ADD Review Chat:
			Silvia reads entire document
			NJW reviews PK's component descriptions
			PK reviews SL's component descriptions
			SL reviews SM's component descriptions
			SM reviews CAO's component descriptions
			CAO reviews NJW's component descriptions
			Everyone reads and corrects introductory chapters

AI26.6		PK,NJW	24 Nov 2003	Find out how to calculate and implement
CLOSED 24/11/03				different response functions for different
					data-taking modes: present proposals
					at Valencia meeting.

AI26.7		NL	30 Nov 2003	Make a new vignetting table (JMXI-VIGN-MOD)
CANCELLED 24/11/03			with improved resolution, down to a step
					size of 5% (?)

AI27.14	PK	3 Dec 2003	Write a SCREW on binning components to use
CLOSED 25/11/03			agreed normalised fluxes

AI27.19	NJW	1 Dec 2003	Send SM a list of SWIDs for empty fields
CLOSED 28/11/03			or nearly-empty fields

AI27.4	CAO	3 Dec 2003	Send NJW energy resolution results for SVR
CLOSED 2/12/03			

AI27.27 CAO	15 Dec 2003	Add the SWG tagging tool in the ADDs
CLOSED 2/12/03			section on dream tools

AI26.10	PK	5 Dec 2003 	Look into creation of new DAL3JEMX function
CLOSED 5/12/03				to calculate fractional exposure

AI27.12 NL	5 Dec 2003	Discuss images and mosaicking with Roland 
CLOSED 5/12/03			Walter at ISDC

AI27.24	NL,JC	15 Jan 2004	Check revolution 41 empty field observations
CLOSED 9/12/03			for weak sources. How empty are these observations?

AI27.1	NJW	5 Dec 2003	Update Science Verification Report for OSA 3.0
CLOSED 7/12/03			based on previous SVR	

AI27.2	SL	3 Dec 2003	Send NJW data on latest source extraction
CLOSED 7/12/03		results and limitations for SVR

AI27.3	SM	3 Dec 2003	Send NJW background handling results for SVR
CLOSED 7/12/03		

AI27.6	PK	3 Dec 2003	Send NJW data binning results for SVR
CLOSED 7/12/03		

AI27.17	PK	1 Dec 2003	Check GRS1915 position in general reference
CLOSED 17/12/03		catalogue

AI27.11	JC	10 Dec 2003	Update mosaiking software to produce
CLOSED 2/1/04			all 6 of the images listed in NL's presentation

AI_031217.1	CAO 	Circulate summary of the Monday JEM-X meetings to all
ONGOING-REGULAR WORK

AI_031217.2	CAO	Add `headlines' from chat meeting to all
ONGOING-REGULAR WORK

AI27.13	JC	20 Dec 2003	Make a data template for midisky images made
CANCELLED		by image_mosaic
	
AI27.28 ALL	1 Dec 2003	Circulate emails with plans for executables
CLOSED 7/1/04			to be available for OSA 3.1

AI27.15	NJW	3 Dec 2003	Write a SCREW on imaging components to use
CLOSED 7/1/04			agreed normalised fluxes

AI27.20	SM	15 Dec 2003	Write SCREW on dal_verify: check for
CLOSED 7/1/04			grouping table numbers that may have been corrupted

AI27.25 SB	15 Jan 2004	Provide a list of instrument configuration
CLOSED 13/1/04		changes: HV setting, rejection criteria, low level
			discriminator etc. etc.
			
AI27.21	SL	15 Dec 2003	Write SCREW on source extraction components:
CLOSED 14/1/04			include background subtraction

AI27.23	NJW	15 Jan 2004	Make images with and without background 
CLOSED 14/1/04		correction, and verify that it makes an improvement
			in weak source detection

AI_040114_1 PK	17 Jan 2004	Arrange a meeting room for SDAST use on
CLOSED 19/1/04		Tuesday morning at the Munich Workshop

AI27.26	CAO	15 Jan 2004	Put instrument configuration list on SDAST
CLOSED 20/1/04		forum

AI040121_3 CAO	23 Jan 2004	Write a screw on DETE-MOD to include a keyword
CLOSED 21/1/04		ONAXAREA to describe the actually illuminated area
			for on axis sources, as modified by dead anodes etc.
			
AI040121_4 CAO	23 Jan 2004	Add an new constant to jemx.h to describe
CLOSED 26/1/04		the ideal on axis illumination of the detector

AI_MMM_5 CAO,PK	19 Mar 2004	PK to send CAO latest version of his
CLOSED 5/3/04		dependancy-finding script, and CAO to make it available
			on the SDAST forum
			
AI_MMM_4 CAO	19 Mar 2004	Make a `Shared Functions Marketplace' webpage
CLOSED	15/3/04		to clarify who wants which functions and who can offer
			prototypes of these

AI_MMM_8 CAO	19 Mar 2004	Make a known data analysis anomalies webpage
CLOSED 15/3/04			for the forum which can track resolution of these
			problems
			
AI26.12		NJW	13 Jan 2004	IMA level to output significance maps
CLOSED 17/3/04

AI27.5	JC	30 Jan 2004	Send NJW Xe-energy resolution results for SVR
CANCELLED 17/3/04 (Not enough empty field data available now or in the
		foreseeable future)			

AI27.10 NL	6  Feb 2004	Update mosaicking discussion to a formal 
CLOSED 17/3/04	 by NJW  	document that can be put on the DSRI document page

AI040121_2 ALL 	4 Feb 2004 	Provide PK and NL with suggestions for
GENERAL WORK 17/3/04	shared functions that could benefit our own software,
			and presumably, everyone elses
			
AI_MMM_6 ALL	19 Mar 2004	Send CAO email detailing what they want and can
GENERAL WORK 17/3/04	contribute by way of shared functions, including their
			own private tools
			
AI040303_1 CAO	12 Mar 2004	Write update to Know Issues file at ISDC
CLOSED 19/3/04		detailing conditions where gain smoothing fails

AI_MMM_7 ALL	19 Mar 2004	Check their output spectra to see if we all get
CLOSED 31/3/04		the same strange step due to vignetting problem

AI040303_4 NJW	2 April 2004	Update CORX/Y-MOD to remove gigantic NULL
CLOSED 28/4/04		values from the `inactive' area of the detector

AI030828_1	NJW	19 May 2004	Look into sources moving parallel to
T.Oosterbroek		COSY / COSZ axes giving problems with vignetting, esp.
will look into this	GRS 1915

AI27.8	PK,SMN	25 April 2004	Adapt scripts to handle the existence of
CLOSED 4/5/04			multi-mode data

AI27.18	SL	15 Apr 2004	Run rev. 57 data on GRS1915 (PIDs 65, 66)
CLOSED 4/5/04			and compare results with NL's results

AI040121_1 PK,NJW 19 May 2004	Make first draft of jemx.shared1.c library	
CLOSED 18/5/04			with headers of suggested shared functions and
			circulate to the rest of SDAST

AI_MMM_1 PK, SL	19 April 2004	Agree on a spectrum output function and 
CLOSED 18/5/04			develop prototype
 
AI040303_3 ALL	30 April 2004	Write email to CAO detailing expected 
CLOSED 18/5/04			improvements in ISSW for OSA 4.0

AI28_3   PK 	End May 2004  Email ISDC-ops concerning instrument reps.\ and 
CLOSED			access to data   
	     
AI28_1   PK  	End May 2004  Make detector spectra of all available SWs to see
CLOSED			 Xe line   
	      

AI28_4   NJW	End May 2004   Add detector pixel corner positions to IC file 
CLOSED 8/6/04		IMOD-GRP   
	       

AI28_5   NJW   	End May 2004  Add detector pixel sizes to IC file IMOD-GRP   
CLOSED 8/6/04	      

AI28_6   NJW 	 End May 2004  Add list of mask open hole positions to IC 
CLOSED 8/6/04			file IMOD-GRP   
	   
AI040428_1 CAO	25th June 2004	Get in contact with ISDC helpdesk and form
CLOSED 25/6/04		a tighter collaboration with them for discovering and
			and tracking analysis result anomalies

AI040608_1 ALL	June 18th 2004 Everyone to send NJW their respective contributions
CLOSED 04/07/29				for the SVR

AI28_ 2  CAO   	25th June 2004  Write SCREW: j\_calib\_gain\_fitting to add HV 
CLOSED 04/07/29		values to gain history   
	
AI26.9		NJW	19 June 2004	Look into making shadowgrams not based on
NORMAL WORK 10/8/04			weighted events, to handle grey filter 

AI26.11		CAO	25 June 2004	Check that deadtime logic works correctly
NORMAL WORK 10/8/04			for grey filtering and buffer flushing

AI_MMM_3 PK,SL,NJW 
		1 July 2004	Decide on a list of required common instrument
NORMAL WORK 10/8/04		modelling functions, possibly implementing different 
			algorithms

AI040303_2 SL	1 June 2004	Write update to Known Issues files at ISDC
OBSOLETE 10/8/04	detailing the spectral jump problem for off axis
			sources.
			
AI_040729_1 PK	Re-make binned detector spectra with OSA 4.0 from data used
CLOSED 1/8/04		to discover anomalies 005 and 007

AI29_8 CAO/SMN 15th Aug. 2004	Compile minutes of meeting and put them on the
CLOSED 12/8/04				DSRI document page

AI29_7 CAO 15th Aug. 2004	Update jemx.h with new STATUS flag values
CLOSED 23/8/04				and distribute to all SDAST	

AI29_5 PK/CAO 1st Sept. 2004	Check whether L-OBT jumps caused by HK rollover
CLOSED 26/8/04				are handled by NP's j_prp_obt programs

AI_040729_3 JC	Re-analyse Xe line position in Rev. 45 using Peter's detector
CLOSED 6/10/04		spectra created with OSA 4.0

AI040907_1	CAO	19 Sep. 2004 Update -DETE-MOD with new values of status
CLOSED 8/10/04			mask contained in jemx.h version 7.23

AI040907_2	CAO	19 Sep 2004 Write and circulate email detailing proposal
CLOSED 8/10/04			for j_cor_position to output a detector map like
				DETE-MOD for use in flux estimation

AI040907_3	PK, NJW, SL October 2004	Read CAO's proposal and decide
CLOSED 20/10/04		whether it would be used to such an extent as to
				be worth implementing (big overhead here)
				
AI041019_1	NJW 25 Oct 2004 Present need for ISDC JEM-X status page at
CLOSED 25/10/04		next Monday Meeting at DSRI and see if anyone is
			interested in creating and maintaining such a page.

AI040907_5	NJW 19 Sep 2004	Send NP file of JEM-X mask pattern
CLOSED 2/11/04
 
AI040907_6	NJW 19 Sep 2004	Determine whether variance maps take into 
CLOSED 2/11/04			account vignetting, and let JC and NP know.

AI29_9 PK 1st Sept. 2004	Provide binned spectra created with assorted
CLOSED 2/11/04				ARFs

AI041019_2	CAO 25 Oct 2004 Write SCREW on j_cor_position to implement
CLOSED 2/11/04			the new JMXi-DETE-STA proposal for OSA 5.0

AI27.16	SL	15 Oct 2004	Verify that XSPEC c-statistic approach works
CLOSED 19/11/04			

AI_MMM_2 NJW/PC	 1 Sept. 2004  Code prototype for a common image output 
CLOSED 19/11/04			function

AI040608_2 NJW	June 9th 2004 Assemble a list of test ScWs on which to test 
OBE 19/11/04			OSA 4.0 and circulate a list of who should do what tests
			on the data

AI_040729_2 SMN  15th Sep. 2004 To re-analyse data used for anomalies 004 and 
CLOSED 19/11/04 				006, using OSA 4.0

AI29_4	SB/CBJ 1st Nov. 2004	To make a wish lish of things they'd like to
OBE 19/11/04			see presented for background modelling for the
				next meeting 
				
AI040907_4	SL, SMN 19 Sep 2004	Send CAO list of OSA 5.0 plans for forum
OBE 19/11/04

AI040915_1  PK, SL, NJW, SM 1st Nov. 2004 Make list of plans for real do-able
CLOSED 19/11/04		shared function library, in time for work to be assigned
			at SDAST meeting in Stockholm.


AI041019_3	SM 18 Nov 2004	Make images and source lists with and without
CLOSED 19/11/04		background subtraction, and draw some conclusions about
			circumstances in which using BKG helps and when it
			doesn't

AI041019_4	NJW, SL 18 Nov 2004 Test Sami's latest BKG access functions and
OBE 19/11/04		give him constructive feedback about how they work

AI041102_1	SL 5 Nov.2004 Send hotel information to all SDAST for Stockholm
CLOSED 25/10/04			meeting

AI30_21 CAO	2004/12/3 Is rev 15 with bad IMOD validity date still a problem?
CLOSED 29/11/04

AI30_12 PK	2004/12/3 Make more detector spectra of recent empty fields for
CLOSED 29/11/04		 	Xe line monitoring

AI30_20 ALL	2004/11/29 Send ADD updates to CAO
CLOSED 3/12/04

AI30_1 CAO	Xmas 2005 Circulate gain history for all crab calibrations
closed 3/12/04
	
AI30_3 CAO	Xmas 2005 Check if unstable anodes  are included in 
CLOSED	8/12/04		JMXi-DETE-MOD, not just bad anodes

AI28_7   NJW	23 Dec 2004    Add keywords (e.g. tilt size and direction) in 
CLOSED 14/12/04				IC file IMOD-GRP: COLL-MOD      

AI30_16 SM	2004/12/3 Decide which C-structures to use for background 
CLOSED 14/12/04			models within ISSW functions

AI30_13 CAO	Xmas 2004 Circulate proposal to include detector aging in gain 
CLOSED 15/12/04			corrections

AI29_6 CAO 	Xmas 2004 Make spectra of the different types of bad
CLOSED 16/12/04		events (esp. bad anodes and bad anode neighbours) to
			see just how bad these really are.

AI30_7 NL/PK	2005/01/15 Propose a new data structure template for Back 
CLOSED		Projection functions used by NL's imaging software

AI30_17 NJW	Xmas 2004 Send SM list of empty fields since last rejection 
OBE			criterion change in instruments, with which to make
			new background models

AI29_3 SM 	Xmas 2004 SM to make zipped package of all his background spectra
CLOSED Dec 2004		and XSPEC fits, and send it to all SDAST members


AI30_9 CBJ/NL	Xmas 2004 Each provide their own value for collimator tilt 
CLOSED 14/2/05			correction and its direction, for comparison
	
AI050209_2 SL	2005/03/01 Write SCREW for improved source extraction
CLOSED 2005/02/23       components to incorporate full collimator modelling

AI050223_1 ALL	2005/03/10 Send CAO emails with agenda items for Madrid
CLOSED 2005/03/08			meeting

AI050223_2 PK	2005/03/1 Send ALL email with hotel suggestions for meeting
CLOSED 2005/03/08

AI050209_1 ALL	2005/02/11 Email comments on updated delivery checklist
CLOSED 2005/03/08	to CAO before checklist is sent to Isabelle and
			Roland
			
AI30_18 NJW/SL/PK	2005/6/17 Each to write a proposal on  how `Smart 
CLOSED 4/5/05		Selection' of radiusLimit parameter should be
			implemented
			
AI30_4 CAO	Feb 2005 Add IMOD periods to tabulated instrument status table
CLOSED 18/5/05		on webpage
	
AI30_19 PK	2005/06/15 Write SCREW on modules that will implement `Smart 
OBE 18/5/05		Selection' for OSA 5.0

AI32_1	ALL	2005/06/20 Everyone to deliver their inputs to the SVR to NJW.
CLOSED 31/08/05				See NJW's workpackage list.			

AI27.9 PK,NJW	19 Sep/Oct 2005	Make spectal response data structure templates
OBE   10/11/05		with data mode keyword tag

AI30_14 NJW/PK/NL	end Jun 2005  Remove overlap in IMOD/detector data
OBE 10/11/05		reading functions already contributed to shared 
			library
	
AI050914_1 NJW	2005/09/16 Circulate a detailed agenda for the SDAST meeting
CLOSED 2005/09/15

AI050914_2 ALL 	2005/09/16 Send CAO an email detailing AI activity and status
OPEN    11/11/05

AI30_2 PK	Jul 2005 Make sure all SRG dummy events treated properly by 
OBE   11/11/05		ISDC system software