SDAST Closed Action Item List
| | | | |
ID Number |
Status |
Responsible |
Due Date |
Description |
AI44_2 | OPEN | ALL | June 2012 |
Turn their presentations into pdf files and send to either
CAO or NJW
|
AI44_5 | OPEN | NL,CBJ | April 2012 |
To ensure that their software gives fluxes in
counts/cm^2/sec
|
AI43_1 | OPEN | NJW,NL,CBJ | April 2012 |
Look into new 7-8keV feature in Crab spectra
|
AI43_4 | OPEN | JC | April 2012 |
At next SDAST meeting present a new plot of position accuracy
for OSA JEM-X images (single pointings and mosaics)
|
AI43_3 | OPEN | JC | April 2012 |
Write a SCREW to get negative spectral bins to work properly in SCW pipeline:
SCREW 2326
|
AI43_2 | OPEN | CAO,CBJ,LP | Dec 2011 |
Look into getting HK and other data into the gain history tables that
are already made: Closed with CAO's email describing new software 20/11/2011
|
AI42_7 | OPEN | NJW | Mid 2011 |
Send out a Doodle email to organize next meeting
|
AI42_6 | OPEN | NJW | Mid 2011 |
Update ARFs for both units
|
AI42_2 | CLOSED | JC | Early 2011 |
Send an email with all his corrections
|
AI42_3 | CLOSED | JC | Early 2011 |
Find which SPRs need to be written or re-activated to solve these problems (AI42_2)
|
AI42_4 | CLOSED | CAO | Mar 2011 |
Send EK SDAST meeting minutes and presentations for instrument archive
|
AI42_5 | CLOSED | NJW | Mar 2011 |
send EK Monday meeting summaries for instrument archive
|
AI34_1 | OBE | CBJ/NL/NJW | Mid 2008 |
Determine azimuthal angle characteristics parameters
(collimator, SPAG, vignetting etc). NL team leader.
|
AI35_2 | CLOSED | NJW | Early 2008 |
Initiate procedures to up date IMOD files with detector map
|
AI35_5 | CLOSED | NJW,CBJ?SB? | Early 2008 |
Prove that the electronic efficiency will produce high quality
ARF for Crab observation interpretation
|
AI38_3 | CLOSED | NL/SB | Dec 2007 |
Investigate and characterize the outliers in NL's flux/position
figures
|
AI38_4 | OBE | NL/PK | Jan 2008 |
Organize testing j_ima_iros 7.1 at ESAC
|
AI38_5 | CLOSED | NJW | Dec 2007 |
Write SCREWs for j_ima_iros, including those to report used
gain and electronic efficiency
|
AI38_6 | CLOSED | NJW/JC | Jan 2009 |
j_ima_iros output must be documented in ADD,including default
energy bands
|
AI38_7 | CLOSED | CBJ/SB/NJW | Jan 2008 |
Prepare a full calibration report
|
AI_39.1 | OBE | NL/CBJ | Sep 2008 |
Do comparison of their physical parameters used in their
methods.
|
AI_39.2 | CLOSED | NL | Sep 2008 |
Provide a physical description of his model and parameters.
|
AI_39.3 | CLOSED | NJW | Sep 2008 |
Check with NL whether BPL file has changed recently and find out
whether it should be updated |
AI_39.4 | CLOSED | JC/SP | Sep 2008 |
Draft cross-instrument section for the current cookbooks
|
AI_39.5 | OBE | NL | Sep 2008 |
Look into the sensitivity question and be encouraged to go back to
the previous level of sensitivity
|
AI_39.6 | CLOSED | SP | Sep 2008 |
Check that the OSM file is available in the SCW pipeline and to
OSA for temperature housekeeping to be used by j_cor_gain
|
AI_39.7 | CLOSED | SP/ISDC | Sep 2008 |
Make a tool to extract intensities from j_ima_iros and re-bin RMF
|
AI_39.8 | CLOSED | NJW | Sep 2008 |
Define standard bins for the rebinning. Default will be 4 coarse
bins. NJW to supply sets of 4, 12, 32, and 64 bins.
|
AI_39.9 | CLOSED | EK | Sep 2008 |
Compare JEM-X and XTE galactic bulge data
|
AI_39.10 | CLOSED | SP | Sep 2008 |
Write agreed SCREWs on the s/w
|
| | | | |
ID Number |
Status |
Responsible |
Due Date |
Description |
AI38_9 | CLOSED 26/6/2008 | SS | Dec 2007 |
Write SPR to remove BKG level from scripts/OSA GUI
|
AI38_2 | CLOSED 26/6/2008 | SDAST | Feb 2008 |
All developpers to review AO documents made available by PK |
AI38_8 | CLOSED 26/6/2008 | SB/CAO | Jan 2008 |
Prepare necessary SPAG tables to update IMOD for JEM-X1 |
AI35_3 | OBE 26/6/2008 | SP | Mid 2008 |
Verify (and urge programmers to ensure) that output of j_src_properites
(lightcurves) is expressed in flux and that the spectra have the
correct ARFs taking into account current gain |
AI38_1 | CLOSED 26/6/2008 | SP | Dec 2007 |
Update ISDC database with new event rate limit value used to determine BTIs |
AI27.7 | OBSOLETE 29/11/07 | NJW | 19 July 2007 |
Make spectral response matrix for REST events
and non-imaging data modes |
AI_070214 | CLOSED 12/3/2007 | ALL | 10/3/2007 |
Send suggestions for SDAST meeting agenda to NJW |
AI_200906_3 | CANCELLED 14/2/2007 | NJW | 29/09/2006 |
Deliver new ARFs to ISDC |
AI35_10 | OBE | SB | 30/06/2006 |
Check whether there have been changes in the spatial gain variation
of the units that require updating the SPAG table |
AI35_8 | CANCELLED | CAO | 31/12/2006 |
Add a search engine to the JEM-X Instrument Forum to make it
easier to find documents |
AI30_5 | CANCELLED | SB | June 2006 |
Add search engine to his instrument status webpage |
AI29_1 | OBE 6/11/2006 | SB | June 2006 |
To provide list of bad periods on webpage where
JEM-X data in one or both unit may be suspect |
AI35_6 | CLOSED 3/11/2006 | CAO | 31/9/2006 |
Update the Gain webpage with average gain factor (PHA/keV) |
AI_200906_1 | OBE 8/11/06 | SB | 22/06/2006 |
Send ISDC list of SCWs where instrument configuration isn't good
for science purposes (BTIs) |
AI_200906_2 | CLOSED 12/10/06 | CAO | 29/09/2006 |
Deliver verified OCL files to ISDC |
AI35_4 | CLOSED 20/9/06 | NJW | 30/4/2006 |
Supply Simona with a list of SCWs to analyse for the science
validation |
AI30_6 | OBE | NJW | 19 July 2006 |
Put numbers (error estimates) to the imperfection of
the vignetting correction |
AI35_11 | CLOSED 30/8/06 | SB, CBJ | 30/4/2006 |
Prpovide new figure of gain increase for SVR |
AI35_12 | CLOSED 30/8/06 | JC | 30/4/2006 |
Provide new figure of detector energy resolution for SVR |
AI35_13 | CLOSED 30/8/06 | CAO | 30/4/2006 |
Check that STATUS values appear in correct order in the table
for SVR |
AI35_14 | CLOSED 30/8/06 | NL | 30/4/2006 |
Edit (mostly shorten) description of IROS procedure in SVR |
AI060607_1 | CLOSED 30/8/06 | CAO | 10/06/2006 |
Deliver template files for IC extensions to ISDC
|
AI060607_2 | CLOSED 30/8/06 | CAO | 15/06/2006 |
Deliver test set of IC files to ISDC and Silvia for script
development |
AI060607_3 | CLOSED 30/8/06 | NJW | 8/06/2006 |
Raise the question of dithering pattern constraints at the next
Monday meeting |
AI060607_4 | CLOSED 30/8/06 | DNSC team | 5/07/2006 |
Send Peter a list of constraints on the free-format dithering
patterns that can be used for KP proposals |
AI060607_5 | CLOSED 30/8/06 | ALL | 1/7/2006 |
Take a look at Soren's HK page and send him comments |
AI35_9 | CLOSED 30/8/06 | SMN | 30/06/2006 |
Implement selection of gain history tables in the scripts |
AI060308_2 | CLOSED 30/8/06 | PK, SMN | 1/05/06 |
Write a section in the ISSW users manual on setting
GTIs for very strong sources |
AI060308_4 | CLOSED 30/8/06 | PK,SMN | 1/05/06 |
Ensure that problem of instrument stabilization is
mentioned in the user manual |
AI35_1 | CLOSED 27/4/06 | JC/CAO | 30/04/2006 |
Make the list of anode status for both units available on the
instrument forum |
AI35_7 | CLOSED 25/4/06 | CAO | 30/4/2006 |
Add clear statement to gain webpage to read the notes if the line
for a revolution is a different colour than usual |
AI060308_5 | CLOSED 7/4/06 | ALL | 15/03/06 |
Send Jerome dates when they are available to be instrument
representative at ISDC |
AI060308_6 | CLOSED 7/4/06 | ALL | 7/04/06 |
Create a list of instrument representative responsibilities
and activities |
AI060308_1 | CANCELLED | NJW,PK | 15/03/06 |
Update limit table used to determine GTIs, especially
hardware and software trigger limits, so that very strong
sources can be viewed. |
AI060308_3 | CLOSED | CAO | 15/03/06 |
Send email to ISDA operators suggesting they report all
unusual activity to us. |
AI060201_1 |
CLOSED | ALL | 15 Feb. 2006 |
Everyone to send NJW an email with their availability for
an SDAST meetingin late March, early April 2006 |
AI050615_1 | REGULAR WORK | CAO | 2006/01/01 |
Re-arrange SDAST forum so that documents are easier
to find |
AI30_11 | OBE 12/12/05 | NJW | end Jan 2005 |
Find fluxes integrated over all energies for all
pointings of last Crab calibration (FM1) using OSA4.2,
to compare with Carls results |
AI30_15 | OBE 12/12/05 | SL/NJW | 2004/12/30 |
Compare C-structures with NL's to streamline
use of structures in the shared library |
AI30_8 | CLOSED 12/12/05 | CBJ | Xmas 2004 |
Make Crab flux error estimates with and without collimator
tilt corrections and circulate to SDAST |
AI30_10 | CLOSED 12/12/05 | CBJ | Dec 2004 |
Remake collimator tilt corrections split up into
several energy bands |
AI29_2 | OBE 12/12/05 | SB/CBJ | 15 Dec. 2004 |
Determine whether new `open' rejection criteria
have actually improved data quality (more real events
vs. more noise) |
Action# On Due Description
Status
AI981113_1 PK 27/11/98 Provide information about tools
& techniques for automatic documentation of ISSW within the ISCD system
Answer: in developement.
CLOSED 27/11/98
AI981113_2 CAO 20/11/98 Provide LaTeX style file for DD
documents to the rest of SDAST for evaluation.
CLOSED 23/11/98
AI981113_4 CAO 20/11/98 Complete and distribute summary
of data format versus data structures.
CLOSED 27/11/98
AI040303_1 CAO 12 Mar 2004 Write update to Know Issues file at ISDC
CLOSED 19/3/04 detailing conditions where gain smoothing fails
AI981120_1 CAO 27/11/98 Find out where imaging data is binned
into spectra in the ISSW. Answer (23/11/98) in JCreateSpectrumMode in
JDataPreparation.
CLOSED 23/11/98
AI981127_1 AH 1/12/98 Make a list over tricky schedule dates
for use at Thursday's planning meeting.
CLOSED
AI981127_4 ALL ASAP Send email to ALLAN to tell him when
you are free for a meeting in January.
CLOSED
AI981127_5 ALL ASAP Send email to CAO with list of points to
raise at the Geneva meeting next week.
CLOSED
AI981127_6 SL 11/12/98 Send URL for prototyping web site to
other SDAST members.
CLOSED
AI981204_1 NJW 15/1/99 Provide calibration spectra in FITS
format to CAO for coding/prototyping/testing of JGainCalculation components.
Also need to provide the values of the peak positions and widths.
CLOSED 14/1/99
AI981204_2 ALL 11/12/98 Determine if there are any dependancies
not appearing on the Gantt chart that could hold up coding.
CLOSED.8/1/99
AI981204_4 CAO/AH/NJW 11/12/98 Send email to other SDAST members
about the subjects discussed at the Geneva meeting (30/11/98 -- 3/12/98) so that
these subjects can be discussed at next week's chat-meeting.
CLOSED(CAO 4/12/98)
AI981211_1 JH 30/12/98 Check over the level1 and 2 data
structures in the Data Structure Definition Document.
CLOSED 8/1/99
AI981218_3 ALL Mid Jan 1999 Check through CTS2.2 and make sure that
there's nothing impossible in it. CAO to find URL for the non-draft release and
send it to all SDAST.
CLOSED 15/1/99
AI990108_1 AH 15/1/99 Set up a meeting with Gerry and/or Jean
to be exclusively about background determination/handling issues. The date will
probably be Febrauary 1/2 1999.
CLOSED 15/1/99
AI990108_3 PK 15/1/99 Inform SDAST of the result of discussions
with ISDC software gurus about the writing of `nice' ISSW, and the correct way
to do things.
CLOSED 15/1/99
AI990108_2 ALL 20/1/99 Ponder the background handling/detemination
problem and send all questions (even `stupid' ones) to NJW so that a proper
overview of the problem can be assembled before the background meeting with
Jean and/or Gerry.
CLOSED 22/1/99
AI990115_2 NJW 1/2/99 Circulate note on background handling
problem to include a list of questions and points raised by SDAST (see
AI990108_2). This note is to be produced in collaboration with Juhani Huovelin.
CANCELLED 22/1/99
AI990115_3 ALL ASAP Read PK's email about nice programming
practices.
CLOSED 22/1/99
AI990122_3 NJW,JH,SL 28/1/99 Create a discussion document on the
background handling problem, that can be used as a basis for discussion in
the Febuary meeting.
CLOSED 27/1/99
AI990122_4 ALL 27/1/99 Think about possible agenda item
for the february meeting and submit them to Allan.
CLOSED 27/1/99
AI990122_5 AH 28/1/99 Make draft agenda for Febuary meeting.
CLOSED 28/1/99
AI981113_3 AH 3/02/99 to look into the usage
of the countrate information provided with the restricted
image mode, especially where it is extracted and where used
Date moved back 22/1/99
CLOSED 5/2/99
AI990122_2 PK 5/2/99 Find out more, or arrange more for the
prospective ISSW school at ISDC
CLOSED 5/2/99
AI981204_5 AH/NL Feb 1999 Provide list of parameters for OSM to
display
CLOSED 26/2/99
AI981218_2 ALL 19/2/99 Provide a list of wishes for JEM-X specific
routine in DAL3.
CLOSED 26/2/99
AI990122_1 ALL 19/2/99 Read Stephane Paltani's web pages on
DAL3 for SPI so that this can be discussed at the next chat-meeting.
CLOSED 26/2/99
AI990205_1 PK ASAP Find out how many ISDC SW gurus can
be available for our ISSW `school' and email us with the results so we can
find good dates.
CLOSED 19/2/99
AI990205_2 ALL 19/2/99 Draw up list of topics to be covered
at the ISSW `School' in March.
CLOSED 26/2/99
AI990226_1 ALL 1/4/99 Find out when we can all make it to
ISDC to see the SAX WFC software. April 22-23rd possibly? Peter to ensure the
software is running at ISDC.
CLOSED 16/4/99
AI990326_1 ALL SDAST 23/4/99 Everyone to read Stephane's proposed
data structures, and make lists of comments etc. so that these structures
can be discussed at a dedicated chat on April 23rd.
Closed 26/4/99
AI990416_1 ALL 23/4/99 Everyone to circulate and email list
of data structure-related questions before the chat meeting dedicated to
that subject
Closed 26/4/99
AI990426_1 CAO ASAP To get the instrument people to provide
an officially updated telemetry packet description to give to ISDC PreProcessing.
This matter to be raised at the next JEMX Tuesday afternoon meeting with
the IT. At the very least we must know which formats are considered stable now.
CLOSED 7/5/99
AI990426_2 ALL 5/5/99 Everyone to circulate emails containing
questions/concerns about instrument description data structures in preparation
for chat meeting Friday 7/5/99.
CLOSED 7/5/99
AI990326_2 CAO ASAP To get NL to send ISDC info on the
countrate packet so that Preprocessing can get to work on this
telemetry.
CLOSED 7/5/99
AI990507_1 AH ASAP Arrange a meeting of ISSW/IT people
to discuss the if and when of observational, rather than Sci Win, analysis.
CLOSED 11/5/99
AI981204_3 AH/NJW May 1999 Determine whether an observational QLA
is needed for JEM-X
CLOSED 21//5/99
AI990528_1 CAO June 7th 1999 Provide a `skeleton' ddd template
to other developers for making very first version of DDD entries for components
still under developement.
Closed 10/6/99
AI990416_2 ALL JUNE 1999 All coders to provide files using
ddd.sty commmands for the DDD: V1 modules require full documentation, while
all others are sufficient with basic information only.
Superceded by AI990820_4
AI990820_1 ALL Today!! Send AH email with DETAILED status of each
and every component for which one is listed on the MOU and ADD.
CLOSED 26/8/99
AI990820_2 AH, CAO Circulate summary of ISSW status to all SDAST
CLOSED 26/8/99
AI990827_1 ALL ASAP Send travel plans and hotel room requirements
to Juhani for Helsinki meeting 22-23 Sept 1999
CLOSED 02/09/1999.
AI990903_1 CAO October 1999 Find out when test data will be available
from a detector with flight electronics which implement the most uptodate
version of the packet formats.
CLOSED 19/11/99
AI12.4 SM End Nov'99 Research better software for weekly remote meetings
CLOSED 19/11/99
AI12.13 All Check consistency of proposed data structures with rest of ISSW
superceded by AI991119_4
AI12a.1 NJW mid Nov'99 Discuss image data structure names with PK
superceded by AI991119_5
AI12a.14 PK Mid Nov'99 Proposed data structure names approved by Stephane
CLOSED 19/11/99 for the six new structures for background data
AI12a.16 NJW Mid Nov'99 Check if the number of rejected events is in the JEMX
CLOSED HK data
AI991112_1 JH 17/11/99 Send CAO details of Finnish student resources
for help with QLA.
CLOSED 19/11/99
AI991112_3 CAO ASAP Circulate updated, complete, consolidated
CLOSED 19/11/99 Open Action Item list to all SDAST members
AI12a.13 SL 3/12/99 Make a technical note on background data storage.
CLOSED 10/12/99
AI12a.11 NJW End Nov'99 Find out when system calibration test is taking place
CLOSED 10/12/99 Answer: August 2000
AI12a.19 NJW Beg.Dec'99 Update technical note on background handling
CLOSED 10/12/99
AI991112_2 CAO End Nov 1999 Set up a repository for test data from
jemx instrument, sorted into ISDC data structures by JDataUnpack.
CLOSED 10/12/99
AI991119_1 CAO ASAP Talk to IT about getting test telemetry
packages sent to ISDC
CLOSED 10/12/99
AI991119_2 SM/EE ASAP Distribute tkirc to SDAST so that it can be
tested by the whole team in December
CLOSED 10/12/99
AI991119_3 AH Mid-Dec Get tkirc running at DSRI in time for test
chat-meeting with this software.
CLOSED 10/12/99
AI991119_4 ALL 3/12/99 Prepare lists of I and O data structures needed
for each component in time for data structures chat on Friday 3rd dec.
CLOSED 10/12/99
AI991119_5 PK 3/12/99 Prepare summary of ISDC policy on the naming
of image data structures, from SPI data structure proposals.
CLOSED 10/12/99
AI12a.7 NJW ASAP Find out if there is a change in the number of
CLOSED DEC'99 bits in the JEMX TIME timing format
AI12a.18 NJW, PK, SL
CLOSED DEC'99 End Feb 2000 Update ADD sections 2.5.2, 2.5.3 and 2.5.4
of ADD (background handling descriptions in various components)
AI991208_2 PK,NJW,SL,JH 10/01/2000 How do we want to store the
background data structures in terms of fits extension(s)???
CLOSED 13/1/00
AI991208_3 PK 10/01/2000 Make a presentation of Reiner's OSM
capabilities especially where GTI's are concerned, for the January meeting
CLOSED 13/1/00
AI991208_4 PK, SL, NJW 10/01/2000 Determine what the later ISSW processing
needs by GTI and event evaluation information.
CLOSED 13/1/00
AI991208_5 PK 10/01/2000 Find an ISDC approved name for the
consolidated GTI data structure and other data structure names mentioned in
SL's summary of 8/12/99.
CLOSED 13/1/00
AI13.1 CAO ASAP Send EID-B5.1 and other docs for JEMX to Nicolas
CLOSED 17/1/00 Produit
AI12.3 CAO Mid Jan 2000 Make a checklist for data sanity checks and include
these in a c program to be distributed amongst SDAST members to be used to
verify data coming out of preProcessing.
CLOSED 18/1/00
AI13.12 ALL Explore the test data available at:
CLOSED 25/1/00 http://www.dsri.dk/~oxborrow/sdast/sdast_forum.html (click on
`Science windows' under heading `Test Data from EM'). Thereafter
possibly request sets of test data and provide feed-back to
Soeren Brandt.
AI13.13 CAO Provide ISDC with the disclaimers for the available test data.
CLOSED 25/1/00
AI13.14 SB Provide a set of test data which is as complete as possible
CLOSED 25/1/00 (All modes, lots of grey filter changes etc.) and with no
known bugs (!).
AI13.7 PK Provide a description of radiation monitor availability, and
CLOSED 25/1/00 other HK data names in ISDC (e.g. JMXi-CSSW-HRW)
AI13.2 NJW/SL/PK JAN 31 Investigate background access at DAL3 function
CLOSED 8/2/00
AI990820_3 ALL End Feb 2000 Send CAO updates for ADD - includes all
background handling material, templates for new data structures and written
overview descriptions and updates to bibliography.
CLOSED 7/3/00
AI12a.17 JH End Feb 2000 Update ADD description of background data handling -
CLOSED 7/3/00 sections 2.5 and 2.5.1 of ADD
AI13.18 JH End Feb ADD: rewrite the generic background handling part
CLOSED 7/3/00
AI13.19 SM End Feb ADD: rewrite the background introduction section
CLOSED 7/3/00
AI13.20 PK End Feb ADD: write general introduction about GTIs: what
they're made
CLOSED 7/3/00 from and where they come from
AI13.21 PK End Feb ADD: provide new data preparation diagram
CLOSED 7/3/00
AI13.22 PK End Feb ADD: Update ISDC context diagrams: NRT, Consolidated,
CLOSED 7/3/00 Offline
AI13.23 ALL End Feb ADD: check component for delivery dates (versions) and
CLOSED 7/3/00 completion status
AI13.24 ALL End Feb ADD: Provide information to CAO to change data
CLOSED 7/3/00 repository information to group data structures in the data
dictionary
AI13.25 ALL End Feb ADD: Make sure each and every component is updated,
CLOSED 7/3/00 and not just a cut-and-paste copy of some other component you
have.
AI_000229_1 ALL 3/03/00 Send CAO ALL contributions to ADD
CLOSED 7/3/00
AI13.3 CAO End Feb Ensure that Hardware team provides a list of
CLOSED 7/3/00 HK parameters to be used for determining GTIs
AI13.4 ALL End February Provide criteria for evaluation of events in
CLOSED 7/3/00 JEventEvaluation
AI13.5 ALL End January Agree on principle of contents of columns in
CLOSED 7/3/00 event files
AI13.6 PK/NJW/SL Jan 31 Decide on skipping hardcoding of production of
CLOSED 7/3/00 reduced formats from Full Imaging for example
in JDataBinning
AI13.10 NJW/AH/PK End Feb Comment on proposal for derivation of
CLOSED 7/3/00 scaling parameters for background
AI13.16 ALL mid Feb Discuss with Nicolas Produit which calibration data
CANCELLED will be availablefor testing at ISDC
AI13.27 SM/JH Jan 31 Specify background requirements for our ISSW to
CLOSED 7/3/00 Southampton - and tell Allan S/H requirements for drawing
formats.
AI13.28 AH Jan 31 Provide the latest JEMX drawings to the SH group
REPLACED
AI981127_2 ALL FOREVER Submit application-by-application
activity reports until the end of the integration phase. End-of-month reminders
to be sent to SDSAT by CAO every month.
REPLACED
AI990507_2 CAO, AH, PK, SB end May 99 To find out how the onboard
binning and PI channels will be determined and how changeable any of these
three might/can be. This requires also consultation with the IT.
CLOSED /7/3/00
AI12.7 ALL End Nov'99 Read DAL3JEMX manual and forward bugs to Stephane
CLOSED
AI991208_1 ALL FOREVER Send CAO complete component status summary
at the end of each month.
REPLACED
AI13.9 PK March 9th Presentation of ISDC GUI at meeting # 14
Closed 9/3/00
AI13.11 ALL 9/03/00 SDAST to think about how exactly to handle the
9/3/00 grey filter in ISSW
AI14.8 PK March 10 Distribute preliminary template for dead-time table
CLOSED 10/3/00
AI14.1 CAO March 16 Provide test data calibration data in new format
CLOSED 31/3/00 for ISDC self-consistent test SWG
AI14.13 CAO March 13 All components to be sent back to developers to be
CLOSED 20/3/00 updated.
AI14.4 CAO April 1 Write the new data structures to the Data Dictionary
CLOSED 4/4/00 for ADD5.0
AI14.11 SL March 19 Comment on the analysis output definitions presented
CLOSED 4/4/00 by PK
AI13.26 ALL April Prepare for ADD second review in April
CLOSED 26/4/00
AI14.2 SM April 1 Describe more fully background model for introduction
CLOSED 26/4/00 to background handling in ADD5.0
AI14.5 NJW April 1 Upgrade ADD entries
CLOSED 26/4/00
AI14.9 ALL End March Specify a first proposal for group dependance in
CLOSED 26/4/00 executable input and output (including INDEX files!)
AI14.10 ALL April 1 Update ADD entry with information on group dependance
CLOSED 26/4/00
AI14.12 ALL April 1 Provide templates for all - especially missing- data
CLOSED 26/4/00 structures for ADD
AI 040400_1 CAO ASAP Find out if there are GRANAT specialists at ISDC
CLOSED 26/4/00
REVII_08 CAO ASAP Send URL for OGIP standards homepage to all SDAST
CLOSED 9/5/00
REVII_07 AH/SB/CAO 15/5/00 To discuss the feasibility of KSC spatial
CLOSED 8/5/00 gain calibration during a monday software meeting.
Must get information from Helsinki first about which
sources they propose to use.
AI14.7 ALL V2 executables must use deadtime table - make your own
CLOSED 25/6/00 dummy values using Peter's template until real test
data is available
REVII_03 PK 15/6/00 Look into the feasibility of setting up an OSM
Closed 25/6/00 (and possibly ROOT too) workshop for SDAST members at
ISDC
REVII_10 ALL 15/5/00 Remove/rename/redesign intermediate files so
Closed 25/6/00 that all data structures become legitimage archivable
ISDC data structures.
REVII_11 CAO Merge j-cor-gain-temporal and j-cor-gain-spatial
Closed 25/6/00
AI990820_4 ALL 11/00 Send CAO contributions to DDD version 1.0
CANCELLED 09/00
AI_000307_1 AH 7/00 Get Josef to make drawings to send to
CLOSED 09/00 Southampton for background simulation
REVII_09 ALL 6/00 Look through OGIP standards and correct own
CLOSED 09/00 data structure column and keyword names accordingly.
AI000509_1 AH/NJW 7/00 Circulate email to rest of SDAST outlining
CLOSED 09/00 ideas for KSC discussed at the DSRI Monday software
meetings.
AI13.8 SM 11/00 Discuss interactive version of background programs
CLOSED 31/10/00 with Bruce O'Neil at ISDC
AI14.6 CAO 12/00 Provide executable to calculate dead-time
REGULAR WORK
001031_5 NJW 8/11 Circulate email about his needs/ideas for
CLOSED 6/11/00 interactive background handling: preparation
for chat
AI16.1 PK 10/00 Figure out if lc_pick is now lc_find and if gti is
CLOSED 7/11/00 now gti_create
AI16.3 PK/SL 10/00 To decide a common start time for time binnings
CLOSED 10/00
001031_3 ALL 8/11/00 Send corrections/feedback to CAO on the new
CLOSED 7/11/00 jemx.h updated with RP2.0 data structures, and
the updated ADD data dictionary.
AI16.2 CAO 10/00 Investigate use of OBT wrong flagging in correction
CLOSED 7/11/00 executables
AI16.12 CAO 10/00 Redo the error code scheme set out in jemx.h to follow
CLOSED 7/11/00 the new ISDCLEVL architecture better
AI16.6 CAO 10/00 To provide a list of data structures to be visualised
CLOSED 7/11/00 together using ROOT/OSM functionalities
AI13.15 NJW/CAO 11/00 Find out what calibration data (products) will be
CLOSED 7/11/00 provided bythe calibration activity, and what
calibration data structuresare needed
AI16.10 ALL 10/00 To provide to Sami a list of what we want the
CLOSED 9/11/00 interactive background analysis to accomplish
001031_1 ALL 12/00 Decide what we want from interactive background
CLOSED 9/11/00 analysis
001031_4 SM 8/11 Send an email to all SDAST about current and future
CLOSED 8/11/00 plans for background handling as preparation for chat
about interactive background handling.
001031_6 SL 8/11 Circulate email about his needs/ideas for
CLOSED 8/11/00 interactive background handling: preparation for chat
001031_7 ALL 9/11 To read the emails about interactive analysis
CLOSED 9/11/00 as preparation for chat about interactive background
handling.
AI16.8 PK 10/00 To sketch I/O and template support for j_ical
CLOSED 7/11/00
CAL1.2 NJW 15/11 To look into where conversion from detector pixels to
CLOSED 15/11/00 mm occurs (maybe it will be in j_cor_position)
AI38.4 CAO 22/11/00 Circulate email about how to use ADD CVS repository
CLOSED 24/11/00 WHEN it's up and running.
AI38.2 ALL 25/11/00 Take a look at the list of common parameter names
CLOSED 25/11/00 and comment on any inconsistencies/problems that might
be discovered. The list is at:
http://www.dsri.dk/~oxborrow/sdast/param_names.html
CAL1.3 CAO 31/11 To make a data structure template for JMXi-SPAG-MOD
CLOSED 1/12/00
AI14.3 SM,AH 10/00 Contact Russian GRANAT specialists to get background
CLOSED 5/12/00 information from mission
AI16.4 SM 10/00 To define interactive background handling
SUPERCEDED by IBH 1.1
IBH1.1 SM/SL 10/12/00Circulate email with a summary of the design
CLOSED 18/12/00 requirements for their executables that were decided
during the chat meeting.
AI40.2 CAO 5/12/00 Ensure that background data structure DOL parameter
CLOSED 5/12/00 names are all in the parameter name list. Parameter names to
use, consistently, dbg and bkg instead of ibg.
AI40.1 PK 10/12/00 Organise informal meeting between SDAST and GRANAT
CANCELLED visitors at ISDC consortium meeting to discuss backgrounds and
background handling.
REVII_02 CAO 2/01/01 Update ADD overview and data dictionary to
CLOSED 19/12/00 include ISDC processing levels based on PK's intro.
REVII-04 ALL 2/01/01 Update component descriptions for all components
CANCELLED (including figures) that use -MOD, -CAL and -CFG files
to describe where these will come from.
REVII_05 CAO 2/01/01 Write a description of location and archiving of
CLOSED 19/12/00 instrument-description data structures based on PKs
description in the review meeting
AI16.7 AH,CAO 22/11/00 Check availability of JEMX slew data for position
CLOSED 22/12/00 corrections
AI16.11 SM 10/00 To provide a detailed description of how the interactive
CANCELLED 03/01/01 background executable will work with data
AI16.13 AH 10/00 Contact Juhani to find out what is needed for the
CANCELLED 03/01/01 background.
IBH1.2 ALL 15/12/00Read and comment SL and SM's emails as
CANCELLED 03/01/01 preparation for more detailed AD figures
IBH1.3 SL, SM 5/1/01 Make and cirulate figures showing proposed data flow
CANCELLED 03/01/01 (data structures) for their respective IBH
tools/executables as preparation for meeting 9/1/01
AI17.6 NJW 28/02/01 Simulate slew data response to see if collimator
CLOSED 11/1/01 footprint can be used for position correction determination
Answer: This will work well, especially for low energies, using
multiple sets of slew data containing sources.
AI17.2 PK 26/01/01 Check if HK long term values are actually stored, so
CLOSED 26/01/01 that one can look at them over long time periods
AI17.1 PK 02/02/01 Will provide the script/executable figures for ADD and
CLOSED 8/2/00 the figures must be commented and redrawn by February 9.
V2_rev1.7 SM/PK 30/1/01 Circulate examples of their *.txt and *.tex
CLOSED 21/02/01 files with parameter descriptions. Everyone else to
use the same layouts in their *.txt and *.tex files.
V2_rev1.6 SL 15/2/01 Circulate email of suggestions for new input
CLOSED 20/02/01 parameters for binning executables. Everyone else to
read and comment on emails
AI17.4 SM 26/01/01 Get information from the Instrument Hardware People
CLOSED 20/02/01 to know what they need more for the performance monitoring than
what is already in the plans for that and OSM
V2_rev1.5 CAO 30/3/01 Update list of allowed values of evtType in the
CLOSED 26/02/01 common parameter name list
REVII_01 PK/ISDC 2/01/01 Provide an introduction detailing ISDC plans
CLOSED 26/02/01 for using ISDCLVL, and how this relates to SWG1 etc.,
data structures and processing.
AI16.9 CAO 2/01/01 To sketch ADD entry for the j_ical executable
CLOSED 23/02/01
AI38.3 CAO 2/01/01 Write little introductory piece of ADD about the
CLOSED 13/03/01 binning tables for the different data taking modes.
REVII_06 SM/SL 2/01/01 Update component descriptions and diagrams that
CLOSED use obsolete data structures: -CYCL-CNV, -DRV1-DRV,
-SPR1-SCP AND SRCL-SFR
REVII_12 ALL 2/01/01 Complete actions indicated by RIDs
CLOSED
AI40.3 ALL 15/01/01 All developers with S/W that uses background data
OVERRIDDEN structure parameter names to correct them using the new
by consistent parameter names and redeliver the affected
V2_rev1.4 executables.
AI18.3 PK ASAP Circulate email about instrument mode enumeration
CLOSED 26/3/01 within SDAST
AI18.5 PK March 2001 Talk to Tim Lock about the mechanisms for updating
CLOSED 23/3/01 SRD and using SCREWs
AI18.7 PK ASAP Circulate chapter 18 of current ISDC SRD
CLOSED 26/3/01
AI16.5 PK/SM 30/11/00 Go through j_performance specifications and see how
CLOSED 16/3/01 well they fit into OSM
001031_2 SM WHENEVER Circulate GRANAT background information within
CANCELLED SDAST when (if) he gets it.
CAL1.1 NJW 15/12 To look into where conversion values for HK parameters
CLOSED come from (JMXi-CONV-MOD)
AI38.1 PK 15/01/01 Borrow ISDC software problem tracking tool for SDAST
CANCELLED integration problems and to-dos.
AI17.5 ALL 26/01/01 provide a list of (also derived) parameters,
CLOSED which need to be monitored from their ISSW as part of
j_performance
AI17.8 JH 28/02/01 Start a Tech Note on the IBG model strategies etc
CANCELLED
V2_rev1.1 NJW 30/3/01 Remove cleanIDX parameter from *.par files
CLOSED and use clobber instead
V2_rev1.2 ALL 30/3/01 Use outSWG, override DOLs and inDol, outDOL
NORMAL WORK correctly in CommonPreparePARS
V2_rev1.3 ALL 30/3/01 Use instMod as parameter to find JMXi-IMOD-GRP
NORMAL WORK DOL
V2_rev1.4 SM/SL/PK 30/3/01 Update background executables with consistent
CLOSED parameter names for background data structures.
AI43.1 PK 23/03/01 Circulate email about ISDC defined constants for
CLOSED 26/02/01 JEM-X data-taking modes. SDAST to implement these
constants in ISSW during V2 consolidation.
AI18.6 CAO ASAP Update and circulate The Figure according to changes
CLOSED 27/3/01 agreed during meeting #18
AI18.2 CAO March 2001 Choose between names j_verify and j_prp_verify
CLOSED 27/3/01
AI18.12 CAO March 2001 Talk to Soeren about electronic calibration and its
CLOSED 28/3/01 place in ISSW
AI18.8 CAO April 2001 Make list of changes required for SRD
CLOSED 28/3/01
AI18.11 SL March 2001 Email JEM-X observers soliciting their wishes/views
CLOSED 26/04/01 on how REST events are to be handled in binning
executables
AI17.7 CAO/AH 30/4/01 Possibly look into usage of
CLOSED 12/04/01 astrometric plate-scale functionality to handle
the position correction determination
AI18.10 PK April 2001 Study feasiblity of making DAL3JEMX tool for
CLOSED 17/5/01 extracting REST images and events
AI45_1 CAO May 2001 Write piece for ADD describing the system used to
CLOSED 20/5/01 assign error codes to the different ISSW components.
AI13.17 NJW June 2001 Ensure that the calibration document will contain
CLOSED 1/6/01 descriptions of data-formats, products etc. which will
be in telemetry format to be provided to ISDC
AI18.4 NJW June 2001 Investigate unfulfilled SRDs 18.21.4 and 18.21.6
Closed 11/06/01
AI19_22 CAO June 2001 At consortium meeting ask if DSRI can have ALL the
CLOSED 27/06/01 data from the payload calibration tests
AI19_18 NJW July 2001 Ask Southampton people what happened to our background
CLOSED 21/06/01 by NL simulations we requested
AI19_8 CAO July 2001 Find error codes for Peter's higher level scripts
CLOSED 3/7/01 jemx-sci-analysis, jemx-scw-analysis, jemx-obs-analysis
AI19_3 CAO July 2001 File SPR with ISDC to correct clock_reset_DUMMY.fits
CANCELLED (RP3.0)that was distributed with RP2.2
AI18.9 NJW June 2001 Add detector pixel map to JMXi-DETE-MOD
CLOSED 5/9/01
AI19_13 CAO July 2001 Send SM list of IBH tools needed, from meeting 18
CLOSED 5/9/01
AI19_5 PK July 2001 Talk with Stephane Paltani about making a generic
CLOSED 6/9/01 tool to calculate detector coordinates from attitude data
AI18.13 PK/CAO Sept 2001 Investigate a tool to write diagnostic data into
CLOSED 10/9/01 -RAW data structure formats - need written sketch of
tool to do this.
AI19_4 PK July 2001 Verify that units of IMAGE_LENGTH in -REST-SRW are
CLOSED 20/9/01 telemetry units (10^-9), and have not been scaled in PP
AI19_10 PK July 2001 Check at ISDC whether OSM creates log files or writes
CLOSED 20/9/01 lists of OEMs etc.
AI19_1 NJW July 2001 Make a template for -ANOD-MOD, or fill the already
CLOSED 4/10/01 existing -DETE-MOD with mapping of anode values/health
AI19_20 ALL Dec. 2001 Think about contents for User Manual
CANCELLED 4/10/01
AI19_21 CAO Oct. 2001 Circulate template for UM document in tex
CANCELLED 4/10/01
AI19_2 CAO July 2001 Meet with hardware team to decide what j_verify should
CLOSED 4/10/01 actually do
AI17.3 CAO Oct 2001 To look into feasibility of having performance
CLOSED 10/10/01 and data preparation tools as one general tool with clever
parameter input (parser).
AI18.14 SM Oct 2001 Create IBH document from SL's overheads and CAO's list
CLOSED 10/10/01 of required tools
AI19_12 SM Oct. 2001 Make tool to construct complete time-filtered table
NORMAL WORK of all performance parameters that must be monitored
AI19_14 PK Oct 2001 Ask at ISDC how to find orbital phase of S/C
CLOSED 8/10/01
AI19_15 SM Oct 2001 Read DAL3AUX user manual to find which conventions are
CLOSED 10/10/01 used for sun angle and roll angle
AI19_16 NJW Oct 2001 Provide SM with function to calculate roll angle
CLOSED 10/10/01
AI19_19 NJW Oct 2001 Give SM his AutoCadd programs for making backgrounds
CANCELLED
AI19_23 SL Oct 2001 Send SM a complete description of the bkg tools he
CANCELLED will need for photon tagging
AI010920_1 PK Oct 2001 Circulate email with lightcurve and spectral data
CLOSED 8/10/01 format proposals, for discussion during October's SDAST meeting.
AI010920_2 ALL Oct 2001 Send Sami emails with all ideas, suggestions,
CLOSED 10/10/01 requirements for the interactive V3 performance/background
components.
AI20.7 CAO ASAP Check why link to instrument model group is dead on
CLOSED 16/10/01 developper's forum web page
AI20.14 CAO Mid Feb 2002 Add `Dream Tools' section to ADD for release 7.0
CLOSED 16/10/01
AI20.11 PK ASAP Investigate how OSM should be exported to other institutes
CLOSED 17/10/01 for V3 developement with OSM/isdcroot
AI20.17 PK ASAP Get ISDC to provide solid list of HK column names
CLOSED 17/10/01
AI20.8 PK ASAP Change RESPONSIB keyword string to `Sami Maisala' in all
CLOSED 17/10/01 background model data structure templates
AI19_6 NJW Oct 2001 Make sure that names in -CRW data structure are the
CLOSED 25/10/01 same as in the diagnostic dump data structure
AI20.2 ALL 26/10/01 Redeliver all ISSW that should use new HK column names
CLOSED 25/10/01 ISDC must come up with final suggestions for column names pretty
soon for this deadline to be met
AI20.13 NJW,CAO End Oct 2001 Assess priority of j-ical tools for a) payload
CLOSED 25/10/01 calibrations b) during operations c) dream tools, V4
AI20.10 PK ASAP Circulate email to SDAST about unit testing and system
CLOSED 29/10/01 environment
AI18.15 NJW/NL Oct 2001 Make sure that IT provides a list/table of HK
CLOSED BY CAO 29/10/01 parameter limits for GTI determination
AIRAND_1 PK Feb 2002 Update figures 3.1, 3.2 and 3.3, and section on GTI
CLOSED 31/10/01 determination for ADD7.0
AI20.9 SM End Oct 2001 Make official delivery of background model data
CLOSED 31/10/01 structures to ISDC using their webpage tool
AI20.6 ALL End Nov 2001 To check that all instrument model files have
CLOSED 31/10/01 all the necessary keywords filled
AI20.12 SM,CAO Send PK and RR emails detailing specific problems with
CLOSED 8/11/01 installation of OSM in Helsinki and Copenhagen
AI20.1 PK,SL 2/11/01 Redeliver all ISSW that needs to use the new spectral
CLOSED 22/11/01 formats
CLOSED PK 31/10/01
AI19_7 NL Nov 2001 Explore running NL's GRB-finding code with Jurek's
MOVED TO event-triggering system - i.e. making a compatible component
NORMAL WORK for ISDC system
AI010906_1 ALL Nov 2001 Look through ALL data structure templates released
ABANDONED with RP3.0 and see whether there are missing templates,
22/11/01 changes, corrections or updates to the templates, or templates
that should be removed. All requests for changes to be emailed
to Marc Turler, PK and CAO. NJW's latest IC templates should
also be looked through.
AI20.3 ALL 26/11/01 To update their help files (*.txt) for all future
CLOSED 22/11/01 deliveries, as per Masha's list of homework distributed at
meeting
AI011108_1 ALL All ADD updates to be ready and in the CVS repository by
CLOSED 22/11/01 9.00 Friday 16th November
AI221101_1 SM 26/11/01 Send CAO email as soon as he's delivered his ADD
CLOSED 5/12/01 updates
AI18.1 NL Nov 2001 Decide identity of instrument representative resident
NORMAL WORK 19/12/01 at ISDC with PI at DSRI
AI20.5 CAO,NJW Keep ISDC informed about all developments in the instrument
CLOSED 19/12/01 status saga
AI20.15 CAO,NJW End Oct 2001 Get together with NL and make a list of test cases
CLOSED 11/12/01 that will be needed for SV tests. Result: informal document
to be circulated in IT and ISDC
AI21.5 PK mid-Jan 2002 Check that his spectral test data are okay in the
CLOSED 3/1/02 zero channel
AI21.1 CAO mid-Feb 2002 Find PK's nice figure of script structure and put
CLOSED 7/1/02 it in ADD 7.0
AI21.3 NJW/NL mid-Jan 2002 Make FITS catalogue of a 25-pointing dithering
CLOSED 10/1/02 test sky to include all the SV test cases and deliver
this to PK
AI21.6 NJW 31/12/2001 Give Spectral response files to SL so that he can get
CLOSED 10/01/02 with coding j_src_spectra
AI020131_1 SL Feb 2002 Circulate email with suggestions on Marc's new
CLOSED 5/02/02 JMX1-SRCL-LCR, JMX1-SRCL-LCR-IDX templates
AI020131_2 SL Feb 8th 2002 Check all the -RAW data structures produced during
CLOSED 9/02/02 ROT (SVT-E) and make SPRs for any anomalies found
AI020131_3 CAO Feb 8th 2002 Check all the FRSS data structures produced during
CLOSED 9/02/02 ROT (SVT-E) and make SPRs for any anomalies found
AI020131_4 PK Feb 8th 2002 Check all the -PRP(OBT) data structures produced
CLOSED 9/02/02 during ROT (SVT-E) and make SPRs for any anomalies found
AI020131_5 SM Feb 8th 2002 Check all the -PRW(packet) data structures produced
CLOSED 9/02/02 during ROT (SVT-E) and make SPRs for any anomalies found
AI020131_6 NJW Feb 8th 2002 Check all the -SRW data structures, grey values
CLOSED 9/02/02 and status table data structures producedduring ROT (SVT-E)
and make SPRs for any anomalies found
AI20.16 CAO Jan 2002 Install RP, scripts, software etc. needed for SV tests
CANCELLED
AI19_9 ALL 26/03/2002 Read, understand, comment and correct Peter's most
CANCELLED recently delivered scripts (download from ISDC config. control
page)
AI20.4 SM,JH 26/03/2002 Find out what the big 4.9KeV peak in the simulated
CLOSED 26/3/02 backgrounds is. Ask Southampton if necessary
AI21.2 CAO,PK mid-Feb 2002 Look into delivering jemx.h as an independant
CLOSED 26/3/02 component so that it can be used by the scripts
AI21.2 CAO,PK mid-Feb 2002 Look into delivering jemx.h as an independant
CLOSED 26/3/02 component so that it can be used by the scripts
AI020314_2 CAO 26/3/02 Produce a draft version of the JEM-X ISSW Science
CLOSED 26/3/02 verification document according to RW's template, to be
discussed at next SDAST meeting
AI020321_1 PK April 2002 Decide on a streamlined procedure for updating
CLOSED 26/3/02 ADD with Tim Lock
AI22.1 PK April 2002 Write SPR on all JEM-X ISSW to change `chatty'
CLOSED 4/4/02 parameter to `chatter'
AI22.7 CAO 5/04/02 Check instrument model data structures ENRG, BORE
CLOSED 5/4/02 and DXBS appear in all relevant documents
AI20.18 ALL 5/4/02 2002 Complete ADD updates for release 7.0
CLOSED 17/4/02
AI22.2 PK April 2002 Set up s/w environment for Silvia under jemx/dev
CLOSED 18/4/02 so that she can help develope scripts
AI21.4 PK 5/4/02 Make test data simulations for SV from the FITS
CLOSED 18/4/02 catalogue provided
AI22.4 PK 5/04/02 Do Standard Analysis of the SV test cases using
CLOSED 18/04/02 ISDC processing environment and circulate results in
tarball to SDAST, especially the astronomers
AI22.11 CAO 24/4/02 Complete GSSR chapter and deliver to ISDC
CLOSED 10/5/02
AI22.13 CAO April 2002 Write SCREW/SPRs for all her V1/V2 components
CLOSED 20/5/02
AI020418_2 ALL May 7th Complete updates for V1/V2 components. Penultimate
CLOSED 7/5/02 delivery before launch
AI22.10 SM 5/4/02 Circulate DETAILED description of background handling
CLOSED 5/5/02 design, algorithms, input, output etc.
AI22.12 PK 24/5/02 Run IOSM on Sami's master performance paramters table
CLOSED 23/7/02 to see if this can be used for performance
visualisation - find out what to do to make it work.
AI22.3 NJW April 2002 Write SCREW that found source fluxes should be
CLOSED 23/6/02 calculated using instrument model data, to lessen
photon leakage
AI22.5 NJW,SL 19/4/02 Go over PK's SV results and provide conclusions for
CLOSED 23/6/02 the SVR
AI22.6 NJW 24/04/02 Complete SVR and deliver it to ISDC
CLOSED 23/6/02
AI22.9 PK,NJW,SM,SL May 2002 Stay in close email contact regarding
WORK background handling design, implementation and coding
AI020502_2 SL, NJW, PK End May. Provide full and detailed critique of Sami's
CLOSED 23/6/02 Architectural Design for interactive background handling
AI19_17 NJW Aug 2002 Provide SM with diffuse sky maps from which to make
CLOSED 19/08/02 diffuse background models
AI18.16 NJW/NL ASAP Make sure IT provides a list of HK parameters
CLOSED 28/8/02 to be monitored by operators in NRT
AI19_11 NL Aug 2002 Talk with IT and Nami about what derived HK parameters
CLOSED 28/8/02 should be used for performance monitoring
AI23.5 PK,NJW Aug. 2002 Find OGIP standard names for Sami's columns COODEG
CANCELLED 28/8/02 and COOSTR
AI23.2 NL Aug 2002 Write SPR on units of flux used for SKY.-IMA images
CLOSED 28/8/02
AI020822_1 NJW Aug 2002 Circulate email with instrument representative rotation
CLOSED 28/08/02 plan to be approved by all participants
AI23.8 SM ASAP Email a summary of his background handling procedure
CLOSED 28/08/02 to all SDAST for comments
AI23.6 PK ASAP Write and URGENT SCREW to change JMXi-ATTI-DBG.tpl
CLOSED 28/8/02
AI23.7 SM ASAP Make the new JMXi-ATTI-DBG.tpl template and deliver
CLOSED 28/8/02 it to Marc and Katja
AI020502_1 SL Aug 2002 Spend a day performing analysis of SV results made by
CLOSED 5/9/02 Peter, and make a report of the results for the SVR
AI23.4 NJW,SL Sept 2002 Decide whether out-of-peak-loss factor should be
CANCELLED part of IMOD-GRP, and if so where and when?
AI020828_1 ALL 6/9/02 Email NJW with list of dates when one is
CLOSED 10/10/02 available/unavailable for duty at ISDC
AI23.1 CAO Sep 2002 Put some numbers to the detector gain problems that
CLOSED 10/11/02 have been uncovered recently
AI22.8 NL,NJW 24/10/02 Make PV phase plan: data handling strategi, personnel,
CLOSED 21/11/02 procedures, documentation and actions
AI021121_1: ALL 28/11/02 Bring edible goodies for the SDAST party in Gland.
CLOSED 28/11/02
AI24.1 PK Jan 1 2003 Check there's nothing wrong with source matching in
CLOSED 4/12/02 q_identify_srcs
AI24.3 PK, CAO ASAP Write SCREW for 16-bit status value in all -COR data
CLOSED 5/12/02 structures
AI24.4 CAO ASAP Get j_prp_verify redelivered with alerts only if a large
CLOSED 5/12/02 fraction of events fall outside active detector area
AI021205.1 PK, NJW, SL Determine a status flag ordering scheme and
CLOSED email it to CAO by Wednesday 11th December
AI030124.1: CAO Feb 2003 Write SCREW and submit templates to extent
CLOSED 20/2/03 j_prp_verify so it can produce dead-anode data
by binning shadowgrams by rawX values
AI24.6 CAO Dec 15 2002 Make SCREW for j-cor_position to flag with a
CLOSED 10/3/03 specific STATUS value all events near/on dead anodes and
close to calibration areas
AI030130.1: ALL End-Feb 2003 Find travel times to Valencia for
CLOSED 6/3/03 SDAST meeting to aid planning of meeting and agenda
AI-CONS.2: CAO March 7 2003. Deliver new JMXi-DEAD-MOD table to NJW
CLOSED 11/3/03 for delivery to ISDC
AI-CONS.1: CAO, CBJ End-March 2003 Deliver new JMXi-SPAG-MOD table to
CLOSED 7/3/03 NJW for delivery to ISDC
AI21.7 NJW Jan 20, 2003 Write architectural design for tool to do source
CANCELLED 1/4/03 finding on merged/mosaiced images
AI21.8 NJW Dec 20, 2002 Write architectural design for tool to do robust
CANCELLED 1/4/03 spectral classification of found sources
AI020418_1 ALL Jan 20 2003 Complete algorithm/limitations/details description
CLOSED 1/4/03 for each component for Masha's UM and Peter's
presentation
AI24.5 NJW Dec 15 2002 Decide on robust strategy/procedure/software
CLOSED 1/4/03 to watch out for new dead anodes that can be used
a) automatically by operators (IOSM) and b) more
complicated offline tool for IR at ISDC
AI24.7 ALL Feb 2003 Complete all tasks listed in the timeline
CLOSED 1/4/03
AI25.2 CAO,JC April 11 2003 Verify SPAG-MOD tables with Carl, esp. where
CLOSED 4/4/03 co-ordinates are concerned
AI25.8 ALL April 4 2003 Provide SVR contributions to CAO ASAP
CLOSED 9/5/03
AI25.3 CAO April 11 2003 Make grey scale version of SPAG tables for
CLOSED 13/5/03 documentation use
AI25.1 PK April 4 2003 Write SCREW on j_dead_time_calc to include
CLOSED - SCREW 1135 buffer loss in RATE_COR
AI25.5 NJW,PK April 17 2003 Check how Sami can separate diffuse and
NORMAL WORK instrument background
AI24.2 NJW June 11 2003 Resolve ARF changes
CLOSED 12/8/03
AI25.4 CAO June 11 2003 Give PK time intervals with constant gains for
CANCELLED OBE ESA report
AI25.6 PK June 11 2003 Help NJW find problem in j_ima_src_find
CLOSED 12/8/03 catalogue handling
AI25.7 PK April 17 2003 Make Sl's *****_pick tools internally available
CLOSED 12/8/03 to SDAST
AI020522_1 ALL June 2003 Everyone to tell Jerome about a) flux units
CLOSED 12/8/03 and b) holiday plans
AI26.15 SL 22 Aug 2003 Put meeting pictures on the Net
CLOSED 21/8/03
AI26.8 PK 31 Aug 2003 Check that data-gap-finding tool can handle
CLOSED 15/8/03 losses due to buffer flushing at end of SCW
AI26.1 JC 31 Aug 2003 Update list of activities to be performed by
CLOSED 1/9/03 instrument representative at ISDC
AI23.3 JC Sept 2003 Write section for the ADD and UM explaining
CLOSED 21/10/03 flux units used for spectra and images
AI26.14 ALL 30 Sep 2003 Circulate emails with ideas for
CLOSED 29/9/03 implementation of a superior imaging tool
used over several SCWs (mosaicing)
AI26.13 NL,NJW,PC 30 Sep 2003 Make a plan for how PC should tackle work
CLOSED 29/10/03 on NL's imaging program
AI030828_2 JC 31 Aug 2003 Email Sami a list of available recent
CLOSED 31/8/03 empty field data
AI031029_1 JC 7/11/2003 Discuss ISDC rotation frequency/length
CLOSED 3/11/03 with NL, not based on observations, and draw up new
rotation list
AI26.2 CAO 31 Aug 2003 Investigate behaviour of JEM-X2 anode 1
CLOSED 5/11/03 calibration source rev.s 30 to 50
AI26.4 PK 22 Aug 2003 Check that relevant data structures are
CLOSED 5/11/03 XRONOS compatible, if possible, and write
SCREWs for those that could be but aren't
AI26.5 SM 31 Aug 2003 Check that the data he's using for BKG
CLOSED 5/11/03 modelling is -COR data that includes
Carl's SPAG and JC's anode corrections
AI031029_2 PK 7/11/2003 Send CAO area and constant name for the
CLOSED 5/11/03 the ideal detector area used to normalise fluxes
AI26.3 PK 30 Nov. 2003 Verify that systematic variations in found
CLOSED 14/11/03 positions of sources are related to the
source's off-axis angle
AI031029_3 ALL 12/11/2003 Perform circular review of ADD 8.0
CLOSED 19/11/03 in preparation for ADD Review Chat:
Silvia reads entire document
NJW reviews PK's component descriptions
PK reviews SL's component descriptions
SL reviews SM's component descriptions
SM reviews CAO's component descriptions
CAO reviews NJW's component descriptions
Everyone reads and corrects introductory chapters
AI26.6 PK,NJW 24 Nov 2003 Find out how to calculate and implement
CLOSED 24/11/03 different response functions for different
data-taking modes: present proposals
at Valencia meeting.
AI26.7 NL 30 Nov 2003 Make a new vignetting table (JMXI-VIGN-MOD)
CANCELLED 24/11/03 with improved resolution, down to a step
size of 5% (?)
AI27.14 PK 3 Dec 2003 Write a SCREW on binning components to use
CLOSED 25/11/03 agreed normalised fluxes
AI27.19 NJW 1 Dec 2003 Send SM a list of SWIDs for empty fields
CLOSED 28/11/03 or nearly-empty fields
AI27.4 CAO 3 Dec 2003 Send NJW energy resolution results for SVR
CLOSED 2/12/03
AI27.27 CAO 15 Dec 2003 Add the SWG tagging tool in the ADDs
CLOSED 2/12/03 section on dream tools
AI26.10 PK 5 Dec 2003 Look into creation of new DAL3JEMX function
CLOSED 5/12/03 to calculate fractional exposure
AI27.12 NL 5 Dec 2003 Discuss images and mosaicking with Roland
CLOSED 5/12/03 Walter at ISDC
AI27.24 NL,JC 15 Jan 2004 Check revolution 41 empty field observations
CLOSED 9/12/03 for weak sources. How empty are these observations?
AI27.1 NJW 5 Dec 2003 Update Science Verification Report for OSA 3.0
CLOSED 7/12/03 based on previous SVR
AI27.2 SL 3 Dec 2003 Send NJW data on latest source extraction
CLOSED 7/12/03 results and limitations for SVR
AI27.3 SM 3 Dec 2003 Send NJW background handling results for SVR
CLOSED 7/12/03
AI27.6 PK 3 Dec 2003 Send NJW data binning results for SVR
CLOSED 7/12/03
AI27.17 PK 1 Dec 2003 Check GRS1915 position in general reference
CLOSED 17/12/03 catalogue
AI27.11 JC 10 Dec 2003 Update mosaiking software to produce
CLOSED 2/1/04 all 6 of the images listed in NL's presentation
AI_031217.1 CAO Circulate summary of the Monday JEM-X meetings to all
ONGOING-REGULAR WORK
AI_031217.2 CAO Add `headlines' from chat meeting to all
ONGOING-REGULAR WORK
AI27.13 JC 20 Dec 2003 Make a data template for midisky images made
CANCELLED by image_mosaic
AI27.28 ALL 1 Dec 2003 Circulate emails with plans for executables
CLOSED 7/1/04 to be available for OSA 3.1
AI27.15 NJW 3 Dec 2003 Write a SCREW on imaging components to use
CLOSED 7/1/04 agreed normalised fluxes
AI27.20 SM 15 Dec 2003 Write SCREW on dal_verify: check for
CLOSED 7/1/04 grouping table numbers that may have been corrupted
AI27.25 SB 15 Jan 2004 Provide a list of instrument configuration
CLOSED 13/1/04 changes: HV setting, rejection criteria, low level
discriminator etc. etc.
AI27.21 SL 15 Dec 2003 Write SCREW on source extraction components:
CLOSED 14/1/04 include background subtraction
AI27.23 NJW 15 Jan 2004 Make images with and without background
CLOSED 14/1/04 correction, and verify that it makes an improvement
in weak source detection
AI_040114_1 PK 17 Jan 2004 Arrange a meeting room for SDAST use on
CLOSED 19/1/04 Tuesday morning at the Munich Workshop
AI27.26 CAO 15 Jan 2004 Put instrument configuration list on SDAST
CLOSED 20/1/04 forum
AI040121_3 CAO 23 Jan 2004 Write a screw on DETE-MOD to include a keyword
CLOSED 21/1/04 ONAXAREA to describe the actually illuminated area
for on axis sources, as modified by dead anodes etc.
AI040121_4 CAO 23 Jan 2004 Add an new constant to jemx.h to describe
CLOSED 26/1/04 the ideal on axis illumination of the detector
AI_MMM_5 CAO,PK 19 Mar 2004 PK to send CAO latest version of his
CLOSED 5/3/04 dependancy-finding script, and CAO to make it available
on the SDAST forum
AI_MMM_4 CAO 19 Mar 2004 Make a `Shared Functions Marketplace' webpage
CLOSED 15/3/04 to clarify who wants which functions and who can offer
prototypes of these
AI_MMM_8 CAO 19 Mar 2004 Make a known data analysis anomalies webpage
CLOSED 15/3/04 for the forum which can track resolution of these
problems
AI26.12 NJW 13 Jan 2004 IMA level to output significance maps
CLOSED 17/3/04
AI27.5 JC 30 Jan 2004 Send NJW Xe-energy resolution results for SVR
CANCELLED 17/3/04 (Not enough empty field data available now or in the
foreseeable future)
AI27.10 NL 6 Feb 2004 Update mosaicking discussion to a formal
CLOSED 17/3/04 by NJW document that can be put on the DSRI document page
AI040121_2 ALL 4 Feb 2004 Provide PK and NL with suggestions for
GENERAL WORK 17/3/04 shared functions that could benefit our own software,
and presumably, everyone elses
AI_MMM_6 ALL 19 Mar 2004 Send CAO email detailing what they want and can
GENERAL WORK 17/3/04 contribute by way of shared functions, including their
own private tools
AI040303_1 CAO 12 Mar 2004 Write update to Know Issues file at ISDC
CLOSED 19/3/04 detailing conditions where gain smoothing fails
AI_MMM_7 ALL 19 Mar 2004 Check their output spectra to see if we all get
CLOSED 31/3/04 the same strange step due to vignetting problem
AI040303_4 NJW 2 April 2004 Update CORX/Y-MOD to remove gigantic NULL
CLOSED 28/4/04 values from the `inactive' area of the detector
AI030828_1 NJW 19 May 2004 Look into sources moving parallel to
T.Oosterbroek COSY / COSZ axes giving problems with vignetting, esp.
will look into this GRS 1915
AI27.8 PK,SMN 25 April 2004 Adapt scripts to handle the existence of
CLOSED 4/5/04 multi-mode data
AI27.18 SL 15 Apr 2004 Run rev. 57 data on GRS1915 (PIDs 65, 66)
CLOSED 4/5/04 and compare results with NL's results
AI040121_1 PK,NJW 19 May 2004 Make first draft of jemx.shared1.c library
CLOSED 18/5/04 with headers of suggested shared functions and
circulate to the rest of SDAST
AI_MMM_1 PK, SL 19 April 2004 Agree on a spectrum output function and
CLOSED 18/5/04 develop prototype
AI040303_3 ALL 30 April 2004 Write email to CAO detailing expected
CLOSED 18/5/04 improvements in ISSW for OSA 4.0
AI28_3 PK End May 2004 Email ISDC-ops concerning instrument reps.\ and
CLOSED access to data
AI28_1 PK End May 2004 Make detector spectra of all available SWs to see
CLOSED Xe line
AI28_4 NJW End May 2004 Add detector pixel corner positions to IC file
CLOSED 8/6/04 IMOD-GRP
AI28_5 NJW End May 2004 Add detector pixel sizes to IC file IMOD-GRP
CLOSED 8/6/04
AI28_6 NJW End May 2004 Add list of mask open hole positions to IC
CLOSED 8/6/04 file IMOD-GRP
AI040428_1 CAO 25th June 2004 Get in contact with ISDC helpdesk and form
CLOSED 25/6/04 a tighter collaboration with them for discovering and
and tracking analysis result anomalies
AI040608_1 ALL June 18th 2004 Everyone to send NJW their respective contributions
CLOSED 04/07/29 for the SVR
AI28_ 2 CAO 25th June 2004 Write SCREW: j\_calib\_gain\_fitting to add HV
CLOSED 04/07/29 values to gain history
AI26.9 NJW 19 June 2004 Look into making shadowgrams not based on
NORMAL WORK 10/8/04 weighted events, to handle grey filter
AI26.11 CAO 25 June 2004 Check that deadtime logic works correctly
NORMAL WORK 10/8/04 for grey filtering and buffer flushing
AI_MMM_3 PK,SL,NJW
1 July 2004 Decide on a list of required common instrument
NORMAL WORK 10/8/04 modelling functions, possibly implementing different
algorithms
AI040303_2 SL 1 June 2004 Write update to Known Issues files at ISDC
OBSOLETE 10/8/04 detailing the spectral jump problem for off axis
sources.
AI_040729_1 PK Re-make binned detector spectra with OSA 4.0 from data used
CLOSED 1/8/04 to discover anomalies 005 and 007
AI29_8 CAO/SMN 15th Aug. 2004 Compile minutes of meeting and put them on the
CLOSED 12/8/04 DSRI document page
AI29_7 CAO 15th Aug. 2004 Update jemx.h with new STATUS flag values
CLOSED 23/8/04 and distribute to all SDAST
AI29_5 PK/CAO 1st Sept. 2004 Check whether L-OBT jumps caused by HK rollover
CLOSED 26/8/04 are handled by NP's j_prp_obt programs
AI_040729_3 JC Re-analyse Xe line position in Rev. 45 using Peter's detector
CLOSED 6/10/04 spectra created with OSA 4.0
AI040907_1 CAO 19 Sep. 2004 Update -DETE-MOD with new values of status
CLOSED 8/10/04 mask contained in jemx.h version 7.23
AI040907_2 CAO 19 Sep 2004 Write and circulate email detailing proposal
CLOSED 8/10/04 for j_cor_position to output a detector map like
DETE-MOD for use in flux estimation
AI040907_3 PK, NJW, SL October 2004 Read CAO's proposal and decide
CLOSED 20/10/04 whether it would be used to such an extent as to
be worth implementing (big overhead here)
AI041019_1 NJW 25 Oct 2004 Present need for ISDC JEM-X status page at
CLOSED 25/10/04 next Monday Meeting at DSRI and see if anyone is
interested in creating and maintaining such a page.
AI040907_5 NJW 19 Sep 2004 Send NP file of JEM-X mask pattern
CLOSED 2/11/04
AI040907_6 NJW 19 Sep 2004 Determine whether variance maps take into
CLOSED 2/11/04 account vignetting, and let JC and NP know.
AI29_9 PK 1st Sept. 2004 Provide binned spectra created with assorted
CLOSED 2/11/04 ARFs
AI041019_2 CAO 25 Oct 2004 Write SCREW on j_cor_position to implement
CLOSED 2/11/04 the new JMXi-DETE-STA proposal for OSA 5.0
AI27.16 SL 15 Oct 2004 Verify that XSPEC c-statistic approach works
CLOSED 19/11/04
AI_MMM_2 NJW/PC 1 Sept. 2004 Code prototype for a common image output
CLOSED 19/11/04 function
AI040608_2 NJW June 9th 2004 Assemble a list of test ScWs on which to test
OBE 19/11/04 OSA 4.0 and circulate a list of who should do what tests
on the data
AI_040729_2 SMN 15th Sep. 2004 To re-analyse data used for anomalies 004 and
CLOSED 19/11/04 006, using OSA 4.0
AI29_4 SB/CBJ 1st Nov. 2004 To make a wish lish of things they'd like to
OBE 19/11/04 see presented for background modelling for the
next meeting
AI040907_4 SL, SMN 19 Sep 2004 Send CAO list of OSA 5.0 plans for forum
OBE 19/11/04
AI040915_1 PK, SL, NJW, SM 1st Nov. 2004 Make list of plans for real do-able
CLOSED 19/11/04 shared function library, in time for work to be assigned
at SDAST meeting in Stockholm.
AI041019_3 SM 18 Nov 2004 Make images and source lists with and without
CLOSED 19/11/04 background subtraction, and draw some conclusions about
circumstances in which using BKG helps and when it
doesn't
AI041019_4 NJW, SL 18 Nov 2004 Test Sami's latest BKG access functions and
OBE 19/11/04 give him constructive feedback about how they work
AI041102_1 SL 5 Nov.2004 Send hotel information to all SDAST for Stockholm
CLOSED 25/10/04 meeting
AI30_21 CAO 2004/12/3 Is rev 15 with bad IMOD validity date still a problem?
CLOSED 29/11/04
AI30_12 PK 2004/12/3 Make more detector spectra of recent empty fields for
CLOSED 29/11/04 Xe line monitoring
AI30_20 ALL 2004/11/29 Send ADD updates to CAO
CLOSED 3/12/04
AI30_1 CAO Xmas 2005 Circulate gain history for all crab calibrations
closed 3/12/04
AI30_3 CAO Xmas 2005 Check if unstable anodes are included in
CLOSED 8/12/04 JMXi-DETE-MOD, not just bad anodes
AI28_7 NJW 23 Dec 2004 Add keywords (e.g. tilt size and direction) in
CLOSED 14/12/04 IC file IMOD-GRP: COLL-MOD
AI30_16 SM 2004/12/3 Decide which C-structures to use for background
CLOSED 14/12/04 models within ISSW functions
AI30_13 CAO Xmas 2004 Circulate proposal to include detector aging in gain
CLOSED 15/12/04 corrections
AI29_6 CAO Xmas 2004 Make spectra of the different types of bad
CLOSED 16/12/04 events (esp. bad anodes and bad anode neighbours) to
see just how bad these really are.
AI30_7 NL/PK 2005/01/15 Propose a new data structure template for Back
CLOSED Projection functions used by NL's imaging software
AI30_17 NJW Xmas 2004 Send SM list of empty fields since last rejection
OBE criterion change in instruments, with which to make
new background models
AI29_3 SM Xmas 2004 SM to make zipped package of all his background spectra
CLOSED Dec 2004 and XSPEC fits, and send it to all SDAST members
AI30_9 CBJ/NL Xmas 2004 Each provide their own value for collimator tilt
CLOSED 14/2/05 correction and its direction, for comparison
AI050209_2 SL 2005/03/01 Write SCREW for improved source extraction
CLOSED 2005/02/23 components to incorporate full collimator modelling
AI050223_1 ALL 2005/03/10 Send CAO emails with agenda items for Madrid
CLOSED 2005/03/08 meeting
AI050223_2 PK 2005/03/1 Send ALL email with hotel suggestions for meeting
CLOSED 2005/03/08
AI050209_1 ALL 2005/02/11 Email comments on updated delivery checklist
CLOSED 2005/03/08 to CAO before checklist is sent to Isabelle and
Roland
AI30_18 NJW/SL/PK 2005/6/17 Each to write a proposal on how `Smart
CLOSED 4/5/05 Selection' of radiusLimit parameter should be
implemented
AI30_4 CAO Feb 2005 Add IMOD periods to tabulated instrument status table
CLOSED 18/5/05 on webpage
AI30_19 PK 2005/06/15 Write SCREW on modules that will implement `Smart
OBE 18/5/05 Selection' for OSA 5.0
AI32_1 ALL 2005/06/20 Everyone to deliver their inputs to the SVR to NJW.
CLOSED 31/08/05 See NJW's workpackage list.
AI27.9 PK,NJW 19 Sep/Oct 2005 Make spectal response data structure templates
OBE 10/11/05 with data mode keyword tag
AI30_14 NJW/PK/NL end Jun 2005 Remove overlap in IMOD/detector data
OBE 10/11/05 reading functions already contributed to shared
library
AI050914_1 NJW 2005/09/16 Circulate a detailed agenda for the SDAST meeting
CLOSED 2005/09/15
AI050914_2 ALL 2005/09/16 Send CAO an email detailing AI activity and status
OPEN 11/11/05
AI30_2 PK Jul 2005 Make sure all SRG dummy events treated properly by
OBE 11/11/05 ISDC system software